Design Principles · Week 1

Fundamentals of Imagery

Design solves problems for people; images are among its strongest tools, when they are chosen, edited and sourced with care.

Four lessons on the visual side of design: what design is and why it starts with the user, how to choose images that work, how to edit photos, illustrations and icons with a purpose, and how to source and license images properly.

  • What design is
  • Form follows function
  • Design thinking
  • First impressions
  • Composition and cropping
  • Brand-fit imagery
  • Editing photos, illustrations and icons
  • Sourcing and licensing

Module introduction

Images with a job to do

Week 1 begins with a definition: design is intentional, creative problem-solving that must be both functional and visually appealing. Everything else follows from it. Images are one of design’s most powerful tools, because people react to them before they read a word, so each image needs a job. You learn to judge images by composition, format and brand fit, to plan them from the wireframe and test them with users, to crop, resize, recolor and reshape them without losing their essence, and to source them from places that give you the right to use them.

The path through Week 1 · Decks W1 L1, L2, L4 and L5
  1. Lesson 1PurposeDesign solves a user’s problem
  2. Lesson 2ChooseComposition, format, brand fit, testing
  3. Lesson 3EditCrop, resize, recolor, reshape
  4. Lesson 4SourceQuality, licenses, selection

Deck lesson 3 of Week 1 was not supplied, so the decks run L1, L2, L4, L5.

Your learning path

Your path through Week 1

Open source guide
01What design isThe week opens by defining design as intentional, creative problem-solving that produces solutions both functional and visually appealing. Looks matter, but they serve the user: design shapes behavior, builds emotional connection and makes things usable, and it reaches far beyond products into services, systems and everyday spaces.14 min02Imagery that worksImages reach people before words do, so they shape first impressions and feelings. This lesson covers how to choose images that compose well, fit small screens and match a brand’s color, atmosphere and temperature, how to plan imagery from the wireframe stage, and six ways to test whether your images are actually working.16 min03Editing imagesMost images need adjusting before they fit a design. This lesson covers four photo techniques (cropping, resizing, color and composition), three ways to customize illustrations and icons (coloring, scaling and modifying shapes), and the rule behind all of them: make the right change, with a purpose, and keep the image clear and consistent with the rest of the design.14 min04Sourcing and licensingWhere an image comes from matters as much as how it looks. This lesson covers why quality shows, six checks before you choose, the main kinds of image source and their trade-offs, the basics of copyright and the four license types the deck names, and a five-step method for selecting images, worked through on an outdoor adventure homepage.16 minWhat you keep from Week 1Week 1 gives you a definition and a workflow. The definition: design is intentional problem-solving that must work and appeal at once, with the user first. The workflow for imagery: choose images that compose well and fit the brand, edit them with a purpose, source them legally, and test whether they work.Summary