Design Principles · Week 1 reference

Glossary

Short definitions as the module uses them, each linked to the lesson it comes from.

Design

The intentional and creative process of problem-solving and creating solutions that are both functional and visually appealing (the deck’s definition).

Review Lesson 1
Form follows function

The principle that an object’s shape should come from what it has to do.

Review Lesson 1
Aesthetics

The look and feel of a design: how it evokes emotions, sets moods and communicates brand values.

Review Lesson 1
Usability

How intuitive, user-friendly and efficient something is to use.

Review Lesson 1
Design thinking

A user-centered, iterative process: empathize, define, ideate, prototype, test and implement, looping back as needed.

Review Lesson 1
Interdisciplinary collaboration

Combining insights from different fields, and from designers and non-designers, to make better-informed design decisions.

Review Lesson 1
First impression

The rapid judgment people form of an interface, largely from its visuals, before reading its text.

Review Lesson 2
Composition

The arrangement of elements within an image or layout so it feels balanced and leads the eye.

Review Lesson 2
Rule of thirds

A composition guide that divides the frame into a three-by-three grid and places subjects on its lines or intersections.

Review Lesson 2
Color temperature

Whether an image’s tones read as warm (golden, orange) or cool (blue, grey), which affects its mood.

Review Lesson 2
Wireframe

A simple structural sketch of a page or screen, often with crossed boxes marking where images will go.

Review Lesson 2
A/B testing

Showing users different versions of a design, for example with different images, and comparing how each performs.

Review Lesson 2
Eye tracking

Technology that records where users look on a screen.

Review Lesson 2
Heatmap

A visualization of where users click, move or look most on a design.

Review Lesson 2
Cropping

Cutting away unwanted parts of an image to focus on the main subject or fit a shape.

Review Lesson 3
Aspect ratio

The proportion of an image’s width to its height, such as 1:1 for a square; keeping it locked avoids stretching.

Review Lesson 3
Resolution

How many pixels are placed in each inch when an image is printed; it doesn’t change the pixels themselves.

Review Lesson 3
Saturation

The intensity of an image’s colors, from grey to vivid.

Review Lesson 3
Raster and vector

Raster images, such as photos, are grids of pixels; vector graphics, such as many icons, are shapes that scale cleanly.

Review Lesson 3
Stock library

A collection of ready-made images licensed for use, free or paid.

Review Lesson 4
Copyright

The protection that gives creators exclusive rights to use, distribute and copy their work, marked by the © symbol.

Review Lesson 4
License

Legal permission to use a work, with conditions and restrictions that vary.

Review Lesson 4
Royalty-free

A license where a one-time payment allows multiple uses, within the license’s limits.

Review Lesson 4
Rights-managed

A license where use is based on set conditions, such as medium, duration or region.

Review Lesson 4
Creative Commons

A family of public licenses with varying conditions, such as crediting the creator.

Review Lesson 4
Public domain

Works free to use because they have no copyright protection.

Review Lesson 4
Attribution

Crediting the creator or source of an image, often required for free use.

Review Lesson 4