Design Principles · Week 1Lesson 3

Study explanation · Lesson 03 · 14 min

Manipulate photography, illustrations and icons

Most images need adjusting before they fit a design. This lesson covers four photo techniques (cropping, resizing, color and composition), three ways to customize illustrations and icons (coloring, scaling and modifying shapes), and the rule behind all of them: make the right change, with a purpose, and keep the image clear and consistent with the rest of the design.

Listen to this lesson

Hear the lesson read aloud, with each sentence highlighted as you go.

Narrated by an AI voice.

Change with a purpose

The deck opens with five skills, and together they describe an attitude as much as a technique. You customize visuals so they fit the design’s needs, not to show off an effect. You edit to reach a specific result. You resize while keeping images clear and in proportion. You transform visuals without losing what made them worth using. And every change should make the visuals feel like they belong to one design language.

  • Customization Tailor visuals to fit the design’s needs.
  • Editing essentials Adjust and refine to achieve the effect you planned.
  • Resizing right Keep clarity and the original aspect ratio.
  • Transforming Adapt visuals without losing their essence.
  • Cohesiveness Every visual echoes a unified design language.

Four photo techniques

Slides 3 and 4 name four key techniques for editing photos for design, each with an example. Cropping is shown on an overhead shot of a shared meal, darkened except for a crop box around one plate of grapes. Resizing is shown with an image-size dialog of the kind found in Photoshop. Color is shown with a hue and saturation dialog: the saturation slider is raised and the meal photo comes out richer. Composition is shown as a product shot, a cosmetic tube and jar on a slice of wood with green leaves, set against a flat green backdrop.

A sensible order for editing a photo · Study-guide sequence of Deck W1 L4, slides 3-4
  1. CropDecide what the photo is about
  2. ResizeFit the slot, ratio locked
  3. Adjust colorBalance, then match the brand
  4. Check in layoutDoes it sit well with everything else?

Cropping before resizing avoids scaling pixels you are about to throw away.

Photo editing techniques · Deck W1 L4, slides 3-4
TechniqueThe deck’s definitionUse it when
CroppingCut out unwanted parts to focus on the main subject.A photo has distracting edges, or the slot needs a different shape.
ResizingChange the image dimensions to fit specific needs.The image must match a layout slot, a screen size or a print size.
Adjusting colorImprove colors for a vibrant and balanced look.A photo looks dull or its colors clash with the brand palette.
CompositionArrange elements for a harmonious and eye-catching layout.You are staging a shot or combining several elements into one image.

Reading the image size dialog

The resizing example is worth decoding, because it explains a common confusion. The dialog shows an image of 6253 × 4169 pixels at a resolution of 300 pixels per inch, which works out to 52.94 × 35.3 centimeters. Those numbers are linked: 6253 pixels divided by 300 pixels per inch is about 20.8 inches, or 52.94 centimeters. Change the resolution and the print size changes while the pixels stay the same. A small chain-link icon joins width and height, which keeps the aspect ratio locked so the picture can’t be stretched. A Resample option, set to Automatic, controls whether the editor actually adds or removes pixels.

  • Pixel dimensions are what the image really contains; screens care about these.
  • Resolution (pixels per inch) only matters when the image is printed at a physical size.
  • Keep width and height linked so the aspect ratio stays the same.
  • Making a photo smaller throws detail away; making it larger can’t invent detail that was never captured.

Key idea“Resizing right” means two things: the proportions don’t change, and the image is never enlarged so far that it turns soft or jagged.

Customizing illustrations

Slide 6 uses one line illustration for all three techniques: a bearded man at a yellow computer, with a thought bubble holding a small flowchart. For coloring, a color picker changes the yellow to purple, so the same drawing can join a brand that uses purple. For scaling, the drawing is simply made smaller to fit its space. For modifying shapes, the curved desk outline is edited away so the drawing fits a different layout. The man, his expression and the style of the line all stay the same, which is the deck’s “adapt visuals without losing their essence” in practice.

  • Coloring Enhance and change colors for a better look, usually toward the project’s palette.
  • Scaling Adjust the size of the illustration as the layout needs.
  • Modifying shapes Edit shapes to fit the design’s requirements, such as removing a background element.
Why illustrations and icons scale more freely than photos · Study-guide illustration

Raster (pixels)

  • Photos are made of a fixed grid of pixels
  • Enlarging spreads the same pixels: soft or jagged
  • Edit by painting and adjusting pixels

Vector (shapes)

  • Many illustrations and icons are stored as shapes
  • Scales up or down with clean edges
  • Edit by changing fills, strokes and paths

A study note: the deck doesn’t use these terms, but they explain why its icon and illustration examples resize cleanly.

Transforming icons

Slide 8 applies the same three techniques to an icon, a simple star. Recoloring uses a swatches panel to turn a light blue star dark blue. Scaling makes a small star larger, keeping its proportions. Changing shape combines a smaller purple star placed inside a blue one, then uses a Pathfinder-style panel to subtract the inner shape, leaving an outlined star. The panels look like those of a vector editor such as Adobe Illustrator, though the slide doesn’t name the tool.

From a filled star to an outline star · Deck W1 L4, slide 8
  1. Two starsA smaller star placed on top of a larger one
  2. CombineA Pathfinder-style panel subtracts the front shape
  3. Outline iconOne clean star outline, ready to recolor

Key ideaIcons usually come in sets. When you change one, keep its stroke weight, corner style, size and color consistent with the others, or the set stops looking like one family.

Read with careThe slide’s overview names resizing, re-coloring and changing shape, while its bullets reuse the illustration slide’s wording, such as “adjust the size of the image”. The techniques are the same; only the labels repeat.

Composition needs breathing room

The composition example on slide 4 works because each object has space around it: the tube, the jar and the leaves don’t crowd one another, and the flat backdrop gives the eye a resting place. The same idea applies when you place any edited image into a layout. This study-guide illustration shows one small card at three densities.

The same card with different amounts of space · Study-guide illustration
CrampedImage and text collide; nothing stands out.
BalancedThe image leads, text follows, space separates them.
AiryCalm and premium, at the cost of fitting less.

Practice the deck’s three activities

The deck has three practical activities, a photo edit “using a tool such as Photoshop”, an illustration customization and an icon transformation, but their step-by-step walkthroughs were in the module video, which was not supplied. These self-guided versions use only the techniques on the slides. Any image editor with crop, resize and hue or saturation controls will do for the photo, and any vector editor for the illustration and icon.

  1. Photo: pick a busy photo. Crop it to one clear subject, resize it to a 1:1 square for a mobile post with the ratio locked, raise or lower saturation until it looks balanced, and compare it with the original.
  2. Illustration: take a free line illustration. Recolor its main accent to a color of your choice, scale it to half size, and remove one background shape. Check that it still reads as the same drawing.
  3. Icon: draw or download a star icon. Recolor it, scale it up, then make an outline version by subtracting a smaller copy from the center.
  4. For each one, write one sentence on what the change did for clarity or cohesion. If you can’t, the change may not have been needed.

A study-guide exerciseTake three product photos from the same online shop and edit them so they look like one set: same square crop, subject at the same size, similar brightness and color warmth. Cohesion is the skill being practiced, not any single edit.

Key takeaways

  • Meticulously adjust for clarity and cohesion.
  • Align every change with the design’s overarching theme.
  • It’s about the right changes, not just any change.
  • Go beyond aesthetics: prioritize usability and communication.
  • Modify with purpose, keeping proportions, clarity and the image’s essence intact.

Built from the Week 1 lecture decks (W1 L1, L2, L4, L5); deck lesson 3 and the module videos were not supplied.

Your study checkpoint

Ready to continue?

Mark the lesson complete once you have read it and tried its idea on something real.

Next · Lesson 4