Where each lesson comes from, what was not supplied, and the places where the material needs a careful reading.
The sources
This week is built from four supplied lecture decks from the American University of Beirut’s “module video” series: W1 L1, Introduction to the Fundamental of Imagery (12 pages); W1 L2, Use Imagery Effectively in Design (20 pages); W1 L4, How to Manipulate Photography, Illustrations & Icons (12 pages); and W1 L5, Sourcing & Using Photography & Graphic Elements for Design (14 pages). Deck lesson 3 of Week 1 was not supplied, so the four lessons here map to deck lessons 1, 2, 4 and 5. The module videos the decks accompany were not supplied either, which means the step-by-step walkthroughs on five “Practical Activity” slides (W1 L4 slides 5, 7 and 9; W1 L5 slides 10 and 11) survive only as headings; the self-guided exercises in Lessons 3 and 4 are the study guide’s. Photos, brand logos and student work on the slides are described, not reproduced, and private individuals credited on slides are not named. The PDFs carry no hyperlinks.
Listening
Every page in this course is read aloud by your device’s own voice. No recorded narration was generated for it. Back to the lessons →
Lessons and their source slides
Lesson
Deck
Slides
1 · What design is
W1 L1, Introduction to the Fundamental of Imagery
1-12 (content 4-11)
2 · Imagery that works
W1 L2, Use Imagery Effectively in Design
1-20 (content 2-19)
3 · Editing images
W1 L4, How to Manipulate Photography, Illustrations & Icons
1-12 (content 2-11; activities 5, 7, 9 are headings only)
4 · Sourcing and licensing
W1 L5, Sourcing & Using Photography & Graphic Elements for Design
1-14 (content 2-13; activities 10-11 are headings only)
Not supplied
W1 L3
—
Lesson 01
What design is, and why it starts with the user
The week opens by defining design as intentional, creative problem-solving that produces solutions both functional and visually appealing. Looks matter, but they serve the user: design shapes behavior, builds emotional connection and makes things usable, and it reaches far beyond products into services, systems and everyday spaces.
The week’s opening question and the definition of design with four examples: wallet app, festival poster, ride-hailing map, coffee packaging.
Deck W1 L1, slides 1-4
The elements of design
Form follows function, aesthetics, usability and problem-solving, beside the chair photo.
Deck W1 L1, slide 5
The impact of design
Three effects, shown on a before-and-after charity homepage credited to a student designer.
Deck W1 L1, slide 6
Broader scope and design thinking
Systems, services and experiences; NN/g’s Design Thinking 101 diagram.
Deck W1 L1, slide 7
Everyday life and collaboration
Recliner, social feed and airport signage; designers and non-designers.
Deck W1 L1, slides 8-9
Takeaways and reflection
Five takeaways; the cost-of-bad-design quote with the unusable teapot and pencil; two reflection questions.
Deck W1 L1, slides 10-11
Lesson 02
Use imagery effectively in design
Images reach people before words do, so they shape first impressions and feelings. This lesson covers how to choose images that compose well, fit small screens and match a brand’s color, atmosphere and temperature, how to plan imagery from the wireframe stage, and six ways to test whether your images are actually working.
Three aims; four reasons first impressions matter, including the unsourced 0.05-second figure.
Deck W1 L2, slides 2-3
The power of well-selected imagery
Message, emotion, images of people and types of imagery.
Deck W1 L2, slide 4
Choosing images: composition and format
Grid, symmetry and cropping pairs; square versus letterboxed post.
Deck W1 L2, slides 5-7
Choosing images: brand fit
Three color tips and three atmosphere tips, each with a wrong/right photo pair.
Deck W1 L2, slides 8-9
Imagery in the design process
Wireframing first; barbershop, wireframe, mobile and food-app examples.
Deck W1 L2, slides 10-15
Testing imagery
When to test and six methods.
Deck W1 L2, slides 16-17
Takeaways and reflection
Five takeaways and four reflection questions.
Deck W1 L2, slides 18-19
Lesson 03
Manipulate photography, illustrations and icons
Most images need adjusting before they fit a design. This lesson covers four photo techniques (cropping, resizing, color and composition), three ways to customize illustrations and icons (coloring, scaling and modifying shapes), and the rule behind all of them: make the right change, with a purpose, and keep the image clear and consistent with the rest of the design.
Five skills: customization, editing, resizing, transforming and cohesiveness.
Deck W1 L4, slide 2
Manipulating photography
Cropping, resizing (with an image-size dialog), adjusting color (hue and saturation) and composition.
Deck W1 L4, slides 3-4
Customizing illustrations
Coloring, scaling and modifying shapes on one line illustration.
Deck W1 L4, slide 6
Transforming icons
Recoloring, scaling and changing the shape of a star icon.
Deck W1 L4, slide 8
Practical activities (headings only)
Photo editing, illustration customization and icon transformation; the walkthroughs were in the video.
Deck W1 L4, slides 5, 7, 9
Reflection and takeaways
Five reflection questions and five key takeaways.
Deck W1 L4, slides 10-11
Lesson 04
Source and use photography and graphic elements
Where an image comes from matters as much as how it looks. This lesson covers why quality shows, six checks before you choose, the main kinds of image source and their trade-offs, the basics of copyright and the four license types the deck names, and a five-step method for selecting images, worked through on an outdoor adventure homepage.
Four aims; high- versus low-quality images on a restaurant landing page.
Deck W1 L5, slides 2-3
Choosing the best images
Six checks, with a blurry and sharp pug portrait.
Deck W1 L5, slide 4
Sourcing
Stock, commissioned and public domain sources; six services with pros and cons.
Deck W1 L5, slide 5
Licensing and legal use
Copyright, licensing, four license types; four guidelines with a watermarked photo.
Deck W1 L5, slides 6-7
Evaluating and selecting
The outdoor adventure homepage and the five-step method.
Deck W1 L5, slides 8-9
Practical activity (headings only)
Plant-based cookbook scenario and integrating images; walkthroughs were in the video.
Deck W1 L5, slides 10-11
Reflection and takeaways
Five reflection questions and four takeaways.
Deck W1 L5, slides 12-13
Source appendix
Where the material needs a careful reading
Read with care
Deck lesson 3 and the videos were not supplied
Week 1’s third deck is missing, and so are the module videos. Five practical-activity slides are headings only; the exercises offered in their place are the study guide’s, built from the decks’ own techniques.
The 0.05-second claim has no source
W1 L2 slide 3 states “0.05 seconds: the time to form an opinion” without citing a study. It is reported as the deck states it and should be read as “almost instantly”.
“Elements of design” used in an unusual sense
W1 L1 slide 5 uses “The Elements of Design” for form follows function, aesthetics, usability and problem-solving. Many sources use the phrase for visual building blocks such as line, shape and color.
Uncaptioned examples read by the study guide
The wrong/right photo pairs on W1 L2 slides 8-9 and the wireframe examples on slides 11-15 carry tips but no explanation of what each image shows. The descriptions of why one image fits better are the study guide’s reading.
Reflection questions that belong to another lesson
W1 L2’s reflection questions ask about form and function, problem-solving and design disciplines, the themes of W1 L1, rather than imagery. Lesson 2 uses an imagery-focused reflection instead.
Source pros and cons are dated
The pros, cons and attribution rules for Getty Images, Shutterstock, Pexels, Unsplash, Freepik and Flaticon are as the deck gives them. Prices and terms change; check each service’s current license.
“Public domain resources” without an example
W1 L5 slide 5 names public domain resources as a source type, but every service shown is a stock or asset library with its own license, not a public-domain archive.
Repeated slide wording
W1 L4 slide 8’s icon bullets repeat slide 6’s illustration wording (“adjust the size of the image”), and W1 L5 slide 11 repeats slide 10’s description. The lessons treat these as copy-over, not new content.
Surveys called “quantitative”
W1 L2 slide 17 says surveys gather quantitative feedback. Rating scales are quantitative, but questionnaires often gather open comments too.