Design Principles · Week 4 reference
Glossary
Short definitions as the module uses them, each linked to the lesson it comes from.
- Negative space
The empty, unoccupied areas around and between the elements of a design; often called white space.
Review Lesson 1- White space
Another name for negative space. It need not be white: any area with nothing competing for attention counts.
Review Lesson 1- Visual breathing room
Enough space around each element that it does not crowd its neighbors.
Review Lesson 1- Emphasis
Drawing attention to the main subject, for example by surrounding it with negative space.
Review Lesson 1- Readability
How comfortably text can be read; improved by clearing space around and within text.
Review Lesson 1- Legibility
How easily letters can be told apart; on the moon poster it improves when text moves off busy areas.
Review Lesson 1- Positive space
The occupied areas where the main subjects, text and controls exist; the design’s focus.
Review Lesson 2- Focal point
The element the viewer is meant to notice first.
Review Lesson 2- Visual hierarchy
The order in which elements are noticed, set by size, contrast and the space around them.
Review Lesson 2- Spatial relationships
How the distances between elements show which belong together and which are separate.
Review Lesson 2- Figure and ground
The figure is the shape the eye takes as the subject; the ground is everything around it. They can swap.
Review Lesson 2- Rubin’s vase
An image that reads as a vase or as two facing profiles, depending on which area is seen as the figure.
Review Lesson 2- Grid system
A structured layout framework of horizontal and vertical lines used to arrange content.
Review Lesson 3- Column
A vertical division of a grid that content can span.
Review Lesson 3- Gutter
The fixed gap between two columns of a grid.
Review Lesson 3- Margin
The space between the grid and the edge of the page or screen.
Review Lesson 3- Manuscript grid
A single-column grid for continuous text, such as books and long-form content.
Review Lesson 3- Column grid
A grid that divides the layout into vertical columns for flexible placement and alignment.
Review Lesson 3- Modular grid
A grid of columns and rows that cross to form equal modules.
Review Lesson 3- Module
One unit of a modular grid, where a row crosses a column.
Review Lesson 3- Hierarchical grid
A grid with columns and rows of varying sizes to emphasize content hierarchy.
Review Lesson 3- Responsive grid
A grid that adjusts the layout to different screen sizes and orientations.
Review Lesson 4- Breakpoint
A screen width at which a layout switches to a different arrangement.
Review Lesson 4- Alignment
Placing elements so their edges line up along shared grid lines.
Review Lesson 4- Consistency
Using the same grid, spacing and alignment throughout a design so its parts feel connected.
Review Lesson 4