Positive space is the stage
Slide 5 defines positive space as the occupied or filled areas where the main subjects exist. It is the primary focus of a design and holds the central content: headlines, images, buttons, icons. The introduction slide puts it more vividly: positive space is “the stage where the drama unfolds,” holding the main characters and scenes that tell the story. If negative space is the pause, positive space is what is said.
- Focal point creation Use positive space to draw attention to the main subject or message.
- Balancing elements Arrange components within the positive space so the whole feels in harmony.
- Visual engagement Make sure the positive space captures attention and guides the user’s interaction.
A home page with one clear focus
Slide 6, titled “Positive Space UI Design,” shows the home page of the chocolate retailer Sunday in Scotland. A full-width photograph of molten chocolate pouring fills the screen. On top of it sit a thin navigation row, a centered circular logo, one headline, “Exquisite Chocolate,” a single line of supporting text and two small dark buttons. That is all. The deck’s three points follow from this restraint: the primary elements are highlighted, the user’s attention is focused, and distractions are reduced.
Positive space
- One headline
- One line of support
- Two buttons
- Logo and slim navigation
Negative space
- The calm, smooth photo
- Large empty areas around the headline
- Nothing else asking to be read
- Attention left with the message
The positive space is small, so each piece of it counts.
Read with careRead with care: the slide is titled for positive space, but much of its effect, the reduced distraction, comes from how little else is on the page. The example works because both kinds of space are doing their jobs, which is exactly the deck’s next point.
A visual dialogue
Slide 7 moves from the two spaces separately to how they work together. The deck calls the relationship a “visual dialogue”: the filled shapes and the empty shapes answer each other, and that relationship shapes both the look of a design and the user’s experience of it. The deck names three ways to balance them.
| Lever | What the deck says | What it looks like in practice |
|---|---|---|
| Visual hierarchy | Use both spaces to establish a clear hierarchy of elements. | The most important item gets the most space around it and the strongest presence. |
| Emphasis and contrast | Use the interplay to guide attention and communicate importance. | A single bold block set against a quiet field stands out immediately. |
| Spatial relationships | Ensure a harmonious balance that aids comprehension and engagement. | Related items sit close together; unrelated ones are separated by clear gaps. |
Read with careThe third column is a study-guide gloss on the deck’s wording.
A contact page in balance
Slide 8 shows a contact page the deck describes as “Positive Space and Negative Space Balanced Perfectly.” On a white page, a large bold “Contact Us” heading sits above one short line of introduction, three underlined fields for name, email and message, a small upload box and a black Send button. All of this occupies a narrow column with generous white space around it. To the right, a solid black “Company Info” panel lists contact details with small icons, overlapping bright yellow blocks. The dark panel is a strong positive shape; the white field around the form is the negative space that keeps the form calm and easy to fill in.
- FirstHeadingLarge, bold, surrounded by white
- ThenThe formThree fields in a narrow column
- ThenSendThe one solid button in the column
- AsideCompany infoA dark panel for those who need it
Read with careRead with care: “balanced perfectly” is the deck’s judgment of one example, not a measurable standard. The slide also shows real-looking contact details, which are not reproduced here.
The power of space
Slides 9 and 10 sum up the deck’s argument. Space has a purpose: it influences the dynamics of a design. Used with understanding, it leads to stronger compositions, and its role is to determine where users focus and to make visual navigation easier. The deck asks you to stop treating these spaces as “mere design extras”; they are foundational, and strategic use of space should be a core principle of every design. The interplay is a balancing act that decides “what catches the eye first,” and it supports aesthetics, engagement and clear communication.
- Decide the one thing the viewer must notice first.
- Give it the strongest positive presence and the most surrounding space.
- Group secondary items with small gaps, and separate groups with larger ones.
- Remove anything that competes with the first item without serving it.
- Squint and check: does the eye still land where you intended?
Key ideaThese spaces aren’t mere design extras; they’re foundational. The deck asks you to treat strategic use of space as a core design principle.
Read with careRead with care: the takeaway that balance “ensures optimal usability and user satisfaction” and that spacing “can influence user actions” is design rationale, not a measured result. The deck cites no study, so treat it as a strong principle rather than a guarantee.
Rubin’s vase: when figure and ground swap
The deck’s reflection uses Rubin’s vase, credited on the slide to My Modern Met. Three panels show the same outline colored three ways. In the first, two black profiles face each other on white. In the second, the same edge is drawn as a black vase on white. In the third, a white vase sits inside a black field whose sides read as two faces. The deck asks: what do you see? A vase, two faces, or both? The point is that positive and negative space are not fixed properties of shapes. Whichever area the eye takes as the figure becomes the positive space, and the rest becomes ground.
Faces are the figure
- Two black profiles
- White gap between them
- The vase is the negative space
Vase is the figure
- One black vase
- White on either side
- The faces are the negative space
Both at once
- A white vase in a black field
- The field’s edges read as faces
- The eye flips between them
Study note: the figure is named after the psychologist Edgar Rubin.
Figure and ground in type
The same switch happens with letters. Dark type on a light page and light type on a dark panel use identical shapes; only which area is filled has changed. Reversed, light-on-dark text is a strong way to make one element stand out, as the dark panel on the contact page does, but it is usually kept short. The samples below use your device’s fonts.
When figure and ground are too close in tone, as in the third sample, the eye struggles to separate them.
Key takeaways
- Positive space is where the main subjects and content live; it holds a design’s focus.
- Use it to create a focal point, balance the composition and guide interaction.
- Positive and negative space only work as a pair; their balance decides what catches the eye first.
- Figure and ground can swap: Rubin’s vase shows that the same edge can be read either way.