Primary emotions: basic and instinctive
Primary emotions are described as inborn, universal, and instinctive. The examples given are love, fear, joy, anger, sadness, disgust, and surprise.
Secondary emotions: learned reactions
Secondary emotions are described as learned reactions that arise from primary emotions. The examples given include pride, guilt, embarrassment, shame, frustration, jealousy, and hope.
Tertiary emotions: complex feelings
Tertiary emotions are described as complex, personal feelings shaped by experiences, beliefs, and personality. Examples include resentment, disappointment, gratitude, worry or anxiety, empathy, bitterness, and contentment. In the session’s example, a parent feels hope when a child does well at school, then disappointment later if the child does not reach the future the parent expected.
Check all three levels, then regulate
The instructor summarises regulation as identifying, recognising, and acknowledging all three levels before responding. Two points stay open in the source: a phrase in the secondary step, translated as “I protect the primary emotion,” is unclear, and the full difference between emotions and feelings is left for the next session, covered in Module 3.2.
- Identify the basic or primary emotion.
- Explore the learned secondary reaction and where it may come from in past experience.
- Acknowledge how the tertiary feeling is affecting your parenting.
- Then regulate rather than react.
The three levels with the deck’s examples
The course deck gives parenting examples for each level and how each affects parenting. Its final regulation step matches this module’s closing reframes: shift guilt into learning, anger into problem-solving, and worry into trust.
| Level | Examples in parents | Deck example | Effect on parenting |
|---|---|---|---|
| Primary | Love, fear, joy, anger, sadness, disgust, surprise | Fear when a child runs across the street without looking | Drives instinctive reactions: fear leads to protection, love to nurturing |
| Secondary | Pride, guilt, embarrassment, shame, frustration, jealousy, hope | Guilt after yelling at a child who talked back | Shapes behaviour: guilt can lead to overcompensating, pride to positive reinforcement |
| Tertiary | Resentment, disappointment, gratitude, worry, empathy, bitterness, contentment | Disappointment when hoped-for grades do not come | Influences parenting style: resentment brings negative energy, gratitude supports mindful parenting |