Four columns first, then A-to-F
The instructor directs learners to use the two techniques in a set order. The four columns expose the goal, the obstructive behaviour, the competing commitment, and the big assumption. That assumption then becomes the belief in an A-to-F sequence: identify a concrete trigger, map the consequences, dispute the belief with contrary evidence, form a more useful belief, and define new feelings and actions.
Worked example: Lina and Maya
Lina wants her 14-year-old daughter Maya to have a peaceful, timely bedtime and enough sleep. Instead, she watches the bedroom door, enters without knocking, lectures Maya, and takes the phone by force, because she fears cyberbullying and being blamed as a neglectful mother. Disputing that assumption, she finds evidence against it: Maya’s private account settings, a content filter the parents had installed, and Maya’s earlier willingness to report a frightening message. Lina and Maya agree on a phone routine, a family charging station where everyone leaves their phone at the agreed time, and brief weekly conversations about Maya’s online experiences.
Reported results, read with care
The instructor reports that after two weeks the reminders were shorter, Maya placed her phone on the charger herself, and Lina’s fear of being neglectful dropped from 8/10 to 3/10. These are results within the teaching scenario, reported verbally, not measured outcomes. The spoken bedtime times vary, but the course deck’s worksheet below places each one: Maya scrolls past midnight, Lina storms in at 11 p.m., her stress spikes at 10 p.m., and the agreed rule is a 10 p.m. device lock-in. The role of a timed phone setting remains unclear.
Make it a habit
The session presents small, repeated actions as the route from a promised change to an automatic habit, and assigns personal practice: choose a real scenario, complete the four columns, find the hidden fear and assumption, then work through A-to-F. The instructor adds that the techniques work for anyone with a goal they struggle to reach, not only for parents.
- Keep the goal simple and take a small step every day.
- Share the goal with a partner, coach, or friend.
- Use quick check-ins and review progress weekly.
Lina and Maya in the deck
The course deck writes the scenario out in full. Its presenting problem is that Maya scrolls social media past midnight while Lina keeps barging in and confiscating the phone, leaving everyone exhausted and angry the next day. After the four columns, the coach asks Lina to rate how true her big assumption feels; she says 8 out of 10.
| Column | Lina’s words |
|---|---|
| 1. My complaint or goal | “I want peaceful, on-time bedtimes so Maya gets enough sleep.” |
| 2. What I do that blocks it | Stands near her door, storms in at 11 p.m., lectures for 30 minutes, and grabs the phone |
| 3. My competing commitment | “I must keep total control of her online life so nothing bad happens.” |
| 4. Big assumption | “If I don’t monitor every minute, she will be cyber-bullied or see harmful content and I’ll be a negligent mother.” |
Turning the assumption around
Part 2 runs the assumption through A-to-F. The deck reports that after two weeks only a couple of reminders were needed, Maya plugged in her phone at 10:05 p.m. on her own on other nights, arguments dropped from a nightly 30-minute battle to a two-minute friendly reminder, and Lina’s sense of being negligent fell from 8 to 3 out of 10. The coach’s reflection is that Lina’s hidden worry, total control to prove she is a good mother, clashed with her real goal of teaching independence and healthy sleep.
| Step | Lina’s responses |
|---|---|
| A · Activating event | “When the clock hits 10 p.m. and I see her light is still on.” |
| B · Old belief | “If Maya stays on her phone, I’ve failed to protect her.” |
| C · Consequences | Panic, rushing into the room, shouting, and Maya hiding her phone use the next night |
| D · Dispute | Maya has private-account settings; a content filter is already installed; last month Maya told her about a creepy message, so she does come to her |
| E · Effective new belief | “My job is to teach safe habits, not police every click. I can set a clear shut-off time with her input.” |
| F · New feelings and behaviours | More confidence and less panic; agree a 10 p.m. device lock-in rule with Maya at 5 p.m., use a family charging station in the kitchen, and plan a weekly 10-minute check-in about her online experiences |
Read with careThe two-week results are part of the teaching scenario, reported without measurement.