Start with safety and relaxation
Create a relaxed and emotionally safe environment first. The instructor models two deep-relaxation options: imagining walking down stairs while counting from ten to zero, or progressively relaxing the body from the feet toward the head while breathing. Let the parent take their time, and do not ask them to close their eyes before they are ready.
Four chairs
The parent physically moves among four positions as the coach guides them.
- Chair 1, the present chair: the current, reflective position the parent always returns to.
- Chair 2, the negative chair: recall the triggering incident and identify the negative emotion and unmet need.
- Chair 3, the positive-emotion chair: recall a time the need was met.
- Chair 4, the replacement chair: revisit the incident through a new emotional lens, with a preferred response and an anchor.
Chair 2: find the need
After relaxation, ask the parent to move to Chair 2 and recall an upsetting incident in which they yelled or behaved in a way they were not proud of. Explore what happened before the reaction, how it escalated, what they felt, and how they felt afterwards. Then ask, “What did you need to feel?” In the instructor’s example the answer is appreciation and validation. Next, ask the parent to open their eyes and return to Chair 1 to say what they concluded. The instructor is explicit that she does not leave the parent sitting in Chair 2.
Six stages in the deck, four chairs in the session
The course deck lays out the same model as six stages. They map onto the session’s four chairs as follows.
| Deck stage | What it involves | Session chair |
|---|---|---|
| 1. Establish a safe, relaxed environment | Guided deep relaxation, such as walking down ten steps while releasing tension | Before Chair 1 |
| 2. Access and acknowledge negative emotions | Recall a recurring trigger fully and speak its truth: “I felt invisible and not good enough.” | Chair 2 (negative) |
| 3. Identify unmet needs and reframe beliefs | Discover the need beneath the emotion: “I reacted harshly not because I’m bad but because I was desperate to feel accepted.” | Chair 2, then reflection in Chair 1 |
| 4. Activate positive emotional states | Visualize, with sensory detail, feeling loved, capable, or validated | Chair 3 (positive emotion) |
| 5. Rehearse the positive response | Replay the original trigger through a new emotional lens | Chair 4 (replacement) |
| 6. Anchor and integrate | Set a physical or verbal anchor, journal successes, and follow up | Chair 4, then Chair 1 |
Read with careThe deck allows Stage 4 to use “a memory or imagined scenario.” The session uses a remembered incident in which the need was present.