Parental Study · Module 5.2

Module 5.2 · Emotional Needs and Integrating the Selves

Look beneath a parent’s reaction for the need that went unmet, and bring the parts of the self back into balance.

A source-grounded guide to emotional needs in parenting, the Emotional Needs Change Model, primary and disowned selves, ego states, defence mechanisms, and staying in role as a coach.