More than IQ
The instructor describes IQ as logic, vocabulary, memory, and speed. Emotional intelligence is understanding and regulating emotions, recovering from setbacks, adapting, interacting positively, and resolving conflict well, and she says both should be considered. No two children are the same, twins included. A child may struggle in mathematics and shine socially, artistically, or musically, and a gifted child may grasp information very quickly while finding another area hard.
A claim to read with care
The instructor stated that 25 percent of intelligence is inborn and linked to the X chromosome, with girls receiving it from both parents and boys from their mothers, while 75 percent is developed. No source or test was given in the session, and the report does not validate it. Treat it as her spoken claim rather than an established fact.
Expectations and projection
Parents can build an unrealistic picture of who their child should be, about grades or about compliant behavior. The instructor links this to stress and to a child trying hard to please. Her reflection question for parents is: “If your child were in front of you, what do you think they see when they look at you?”
Effort, and not yet
Go beyond “good job” by naming what the child did well, the effort they made, and why it mattered. When a child says “I am bad at math,” add the word yet: they have not mastered it yet. Remind them they are learning, avoid drawing conclusions from one test, and recall skills they learned slowly, such as walking, cycling, or football.
Pressure, homework, and diagnosis
The instructor warns against heavy academic pressure and against doing children's work for them. Support homework without completing it, and if parents cannot stay regulated while teaching, they should not force it in a way that brings shouting or perfectionism. She also warns against fixed labels such as the smart child and against treating natural high activity as ADHD, and asks practitioners to find out who made an ADHD diagnosis and to request the documentation.
What the deck adds
The deck names multiple intelligences, after Gardner: words, numbers, pictures, movement, music, social skills, self-reflection, and nature. It adds SMART goals, such as writing two journal paragraphs three times a week, and signs of overpressure such as test anxiety, school refusal, and physical complaints linked to stress. For gifted children it suggests enrichment without overwhelming, and for learning differences such as dyslexia, structured support and strength-based parenting rather than labels.