Parental Study · Emotional Smartness, Emotional Needs, and the Two Selves
Glossary
Key terms as they are used in this recording, with links back to the lesson that explains them.
- Visualization
Mental rehearsal of a situation or chosen response. In this recording it can be used independently of the complete ES or EN models.
Review Lesson 1- Anchoring
Using an agreed cue, such as a bracelet, to recall an intended behavior or reminder.
Review Lesson 1- Emotional Smartness (ES)
The Chapter Five technique described through chair movement, visualization, self-dialogue, reframing, emotional attractors, and memory reconstitution. Its complete sequence is not taught here.
Review Lesson 2- Emotional Needs (EN)
A related model that additionally identifies the emotional need involved in a situation.
Review Lesson 2- NEA
Negative Emotional Attractor, as expanded by the trainer. A later inconsistent abbreviation remains unclear.
Review Lesson 2- PEA
Positive Emotional Attractor, named alongside NEA as an ES component.
Review Lesson 2- Memory reconstitution
Changing the meaning or perspective attached to a memory without changing the historical event.
Review Lesson 2- Validation
Acknowledging that another person's feeling exists and is real for them rather than minimizing or erasing it.
Review Lesson 3- Emotional need
A need operating in a situation, such as safety, belonging, significance, validation, support, or being heard.
Review Lesson 3- Primary self
The more dominant personality tendency in the trainer's reflective model.
Review Lesson 4- Disowned or secondary self
An opposite, less-expressed personality tendency that is still regarded as part of the person.
Review Lesson 4- Reality Check technique
A technique named as supporting perspective-taking in the family discussion; its steps are not explained in this recording.
Review Lesson 3