Look behind the child’s refusal
In the discussed case, the mother said no and the father openly said yes. The trainer interpreted this as teaching the children that the mother’s direction need not be followed. She also applied the same concern in reverse: either parent can undermine the other.
- Do not focus only on the end result that the child does not listen.
- Examine what the adults communicate through their responses to one another.
- Avoid assuming that a child-focused technique alone can resolve an adult alignment problem.
- Very young children were described by the trainer as noticing these contradictions.
Seek a non-undermining agreement
The trainer modelled a mutual agreement: when one parent gives a direction, the other does not contradict it in front of the children. The parents should discuss how they will support each other rather than teaching children to disregard either adult.
- Frame the agreement as mutual rather than as one parent controlling the other.
- Explain the connection between adult contradiction and difficulty maintaining expectations.
- Keep the coach’s role within the session boundary: explore and facilitate agreement rather than claiming to resolve the relationship with an absent parent.
- The session did not specify what parents should do when a direction presents an immediate safety concern.
Boundaries are not the whole response
The trainer said the mother needed more than boundaries. She named household rules, standards, reinforced expectations, consequences, firmness, consistency, and the ability to say no without repeated instructions.
- Clarify the household rule or standard.
- Discuss how the expectation will be reinforced.
- Identify the consequence connected to the behaviour.
- Support a firm and consistent response.
- Do not promise that alignment will change a child’s underlying activity level; the trainer specifically said the child could remain energetic.
Treat the 70/30 split as a trainer heuristic
The trainer emphatically described the problem as 70% parental dynamics and 30% one-to-one child strategies. No method or supporting evidence for this percentage was supplied. It should therefore be understood as her way of stressing the importance of adult dynamics, not as a measured outcome or universal formula.
- Retain the main teaching point: adult alignment may require attention before child strategy.
- Do not calculate progress or allocate services according to the stated percentages.
- Do not generalise the split to every family.
Explore beliefs before confronting them
When a parent equates love with allowing a child to do whatever they want, the trainer recommended beginning with open questions. She described using roughly the first fifteen minutes of a session to understand beliefs and principles and reduce possible resistance.
- What does respect mean to you?
- What does respect between a child and parent look like?
- How should parents show respect to a child?
- What does love mean to you?
- How does a parent show love to a child?
- How does a child show love to a parent?
- Use the answers to decide where and how to begin rather than immediately arguing with the parent.