Parental Study · Parental Coaching: Family Dynamics, Love, and Relational Repair

Glossary

Key terms as they are used in this recording, with links back to the lesson that explains them.

Open system

As partly used in the session, a family arrangement involving movement between nearby family spaces and possible extended-family participation. The definition was incomplete and also mixed with permissive child behaviour.

Review Lesson 1
Closed system

The alternative family-system category named by the trainer, but not separately defined in the recording.

Review Lesson 1
Boundary

A limit on behaviour; the trainer said boundaries should be accompanied by rules, standards, consequences, firmness, and consistency.

Review Lesson 2
Parental consistency

A mutual practice of not openly reversing or undermining the other parent’s direction in front of the children.

Review Lesson 2
Consequence

A response connected to behaviour, named by the trainer as part of child-focused strategy alongside a firm and consistent approach.

Review Lesson 2
Fixed mindset

The session’s term for a rigid belief that may generate resistance, such as equating love with letting children do whatever they want.

Review Lesson 2
Love language

The actions through which a person recognises or expresses love, such as attention, care, gifts, affection, or shared activities.

Review Lesson 3
Self-confidence

In the trainer’s distinction, the sense that one is able to do or accomplish something.

Review Lesson 4
Self-esteem

In the trainer’s distinction, the sense of remaining loved and belonging to the family despite mistakes or failure.

Review Lesson 4
Relational repair

Direct correction and restoration after a harmful relational message; the trainer said it must come from the parent who verbally withdrew love.

Review Lesson 4
Emotional needs technique

A technique the trainer said she might consider when exploring possible unmet emotional needs. Its steps were not explained, and the proposed needs were hypothetical.

Review Lesson 1