Self-confidence and self-esteem are not interchangeable
The trainer corrected a participant who described a mistake-related concern as low self-confidence. In the trainer’s distinction, self-confidence concerns ability, while self-esteem concerns continued love and family belonging after mistakes or failure.
- Self-confidence: “I can do this; I am able to do it.”
- Self-esteem: “Even if I fail or make a mistake, I am still loved and still belong to this family.”
- Use the distinction to clarify the coaching conversation rather than attaching a diagnosis to the child.
Separate behaviour from love
A participant reported that the father sometimes told the child, “I do not love you anymore” during conflict. The trainer connected this statement to the child’s sense of love and belonging. The immediate clarification described in the session was that the parent is upset about the behaviour, not that love has ended.
- Make clear that the problematic behaviour can be addressed without withdrawing love.
- Avoid using loss of love as a consequence.
- Do not assume that reassurance from the other parent fully resolves the rupture.
Repair should come from the person who caused the rupture
The trainer said the father who made the statement needed to correct it himself. The other parent could clarify the message immediately, but could not perform the whole relational repair on his behalf.
- Support an immediate distinction between anger about behaviour and continued love.
- Seek direct correction from the parent who communicated withdrawal of love.
- Do not substitute excessive gifts for a direct repair.
- The recording did not provide a scripted repair conversation, so a coach should not present an invented script as the trainer’s procedure.
Notice compensation patterns
The trainer warned against giving excessive gifts to compensate after saying love has been withdrawn. A participant also recognised that she had sometimes bought small items after upsetting her children without noticing the pattern until her partner pointed it out.
- Invite non-judgmental observation of what happens after conflict.
- Distinguish direct relational correction from buying something to reduce discomfort.
- Encourage accurate self-observation rather than assuming only the other parent makes mistakes.
Consider a partner’s receptiveness
Participants described different outcomes from sending parenting videos to their partners. One partner found the material helpful; another interpreted it as criticism or an attempt to teach him how to parent. The trainer concluded that the strategy might or might not work.
- Consider whether the partner has shown interest in receiving material.
- Notice whether the sharing is experienced as support or criticism.
- Observe the response and adjust rather than assuming the same approach will work for every couple.
- Frame useful sharing as helping a willing partner, not proving that one parent knows better.
- The recording does not provide a guaranteed method for obtaining a reluctant partner’s cooperation.