Week 2: Defining a Project and Its Objectives

This map preserves the deck’s teaching sequence while the lessons provide a clearer, learner-facing explanation. Use it to trace every study topic back to the supplied source.

How to use this page

Open a lesson source note for its original teaching focus and slide range. Slide numbers are PDF page numbers, because the deck’s speaker notes run onto extra pages. The deck itself is not republished here; distribute the original PDF only when you hold the necessary rights.

Lesson 01

What makes work a project

Separate projects from the ongoing work that keeps an organization running, and see why that line matters at handover.

Open learner explanation
Original project definition

The source presents PMI’s definition of a project, then explains its temporary and unique characteristics through building, software, curriculum, product-design, hospital, humanitarian, and algorithm examples.

Source slides 2-8
Original organizational-work content

The source contrasts projects with operations, introduces maintenance as a separate function using a water-pump example, and argues that operations and project work need different people, with operations involved throughout.

Source slides 9-15
Original irrigation example

The source’s video example describes a control room placed next to a village power plant to reduce cabling costs without consulting the eventual operator, meeting short-term goals but compromising long-term functionality.

Source slides 16-17

Lesson 02

Defining success: the triangle and beyond

Measure a project against cost, schedule, and quality, then add sustainability, treat safety as a given, and keep KPIs few.

Open learner explanation
Original success-measure content

The source presents the iron triangle of cost, schedule, and quality, a chart of on-time and on-budget delivery across software, construction, and humanitarian projects, and sustainability as an emerging fourth dimension.

Source slides 18-24
Original safety and KPI content

The source argues that safety is a given rather than an objective, defines KPIs against project objectives, and warns that too many KPIs dilute focus, especially on complex projects.

Source slides 25-31

Lesson 03

Programs, strategy, and tactics

See why related projects are grouped into programs, and how strategy and tactics connect them.

Open learner explanation
Original program-management content

The source explains why related projects are grouped into programs, shows a program containing projects and other related work, and compares project and program management by focus, scope, timeframe, complexity, risk, and strategy.

Source slides 32-37
Original strategy, tactics, and examples

The source defines strategy and tactics using a rural digital-education example, then contrasts projects and programs in humanitarian, software, and construction settings.

Source slides 38-47

Lesson 04

Portfolios and organizational project management

Move up a level: choose the right work, then connect projects, programs, and portfolios to strategy.

Open learner explanation
Original portfolio content

The source defines a portfolio, lists selection criteria such as return on investment and strategic alignment, and shows a hierarchy combining programs, standalone projects, and other related work.

Source slides 48-52
Original OPM content

The source presents organizational project management as the framework that guides portfolio, program, and project management, aligned with and driven by strategy, and bridging strategy and tactics.

Source slides 53-56
Original example and comparison

The source uses a school, the Zahle Region Community Recovery program, and a Lebanon war-response portfolio as a worked example, then compares the three disciplines by definition, scope, objective, time horizon, and focus.

Source slides 57-64

Lesson 05

The project management office

Recognize supportive, controlling, and directive PMOs by how much control they exercise, and what else a PMO does.

Open learner explanation
Original PMO types

The source defines the PMO and describes supportive, controlling, and directive PMOs, including what each provides and a figure ranking their level of control over projects.

Source slides 65-74
Original list of other PMO roles

The source lists thirteen further PMO roles, from managing interdependencies and recommending termination to providing templates and sitting on change control boards.

Source slides 75-77

Lesson 06

Predictive, agile, or hybrid

Match the delivery approach to the project: lock definition early, adapt in cycles, or combine both.

Open learner explanation
Original predictive and waterfall content

The source introduces predictive, agile, and hybrid approaches, then describes predictive project management and the waterfall sequence of requirements, design, implementation, verification, and maintenance.

Source slides 78-84
Original agile, Scrum, and hybrid content

The source describes the agile approach and its plan, design, test, deliver, and feedback cycle; the Scrum flow from product backlog to finished work in one-to-four-week sprints; and when a hybrid approach fits.

Source slides 85-92

Lesson 07

From business objectives to project objectives

Start from why the project exists, then translate that into cost, schedule, and quality targets the team can deliver.

Open learner explanation
Original business-objective content

The source defines business objectives as strategic drivers defined by the sponsor, gives typical growth, sustaining, regulatory, and sustainability objectives, and presents humanitarian project goals with seven outcome categories.

Source slides 93-103
Original translation and MoSCoW content

The source explains how business objectives become project objectives with cost, schedule, and quality targets, and applies the MoSCoW method to an e-commerce platform.

Source slides 104-110

Lesson 08

Writing SMART project objectives

Replace “fast and cheap” with objectives that are specific, measurable, achievable, relevant, and time-bound.

Open learner explanation
Original vague-objective and SMART content

The source explains why objectives like “fast and cheap” fail, then introduces the SMART framework and its five criteria.

Source slides 111-117
Original SMART criteria and examples

The source works through specific, measurable, attainable, relevant, and time-bound objectives, each with vague and improved examples such as a Net Promoter Score target and a churn-reduction deadline.

Source slides 118-129

Source appendix

Where the deck needs a careful reading

Read with care

Program time horizon

Slides 36-37 call programs “ongoing, potentially indefinite,” while the detailed comparison on slides 59-63 says programs are finite and end when their benefits are realized. The lessons follow the later comparison.

Who is “doing the right things”

Slide 37 gives this phrase to program management. Slides 59-61 describe programs as “doing projects right, together” and portfolios as “doing the right projects.” The lessons use the later three-way framing.

Iron triangle labels

The bullets on slide 23 say cost, time, and scope, while the figures on slides 19 and 23 and the objectives on slides 104-105 use cost, schedule, and quality. The lessons use cost, schedule, and quality.

On-time and on-budget chart

Slide 21 gives no data source, date, or sample, and its notes limit it to showing how much the industry still has to do. The lessons treat it as directional, not as a benchmark.

Safety as a given

Slides 25-26 present safety as a given rather than an objective, explicitly as the instructor’s own view. The lessons present it as the course’s position.

Leftover headings and labels

Slides 33 and 49 carry front-end-loading headings over program and portfolio content, slides 44 and 46 are both labelled “Example-2,” and the notes on slide 12 say “maintenance” where they mean operations. The lessons teach the body content.

Checked against the source slides cited in each note.

What not to take away

The lessons actively work against these misreadings of the material:

  • Any piece of work an organization does is a project.
  • Operations can be consulted after the asset is handed over.
  • Maintenance and operations want the same things from an asset.
  • More KPIs mean better control.
  • Safety is a target to trade off against cost and schedule.
  • A program is simply a large project.
  • Everything in a portfolio has to be related.
  • Every PMO has the same authority over projects.
  • Agile means the scope is never defined.
  • One delivery method suits every project.
  • “Fast and cheap” is a usable project objective.
  • A specific, measurable goal is automatically worth pursuing.

Study-guide synthesis; each item is addressed in the lessons.