Original source guide
Week 2: Defining a Project and Its Objectives
This map preserves the deck’s teaching sequence while the lessons provide a clearer, learner-facing explanation. Use it to trace every study topic back to the supplied source.
How to use this pageOpen a lesson source note for its original teaching focus and slide range. Slide numbers are PDF page numbers, because the deck’s speaker notes run onto extra pages. The deck itself is not republished here; distribute the original PDF only when you hold the necessary rights.
Lesson 01
What makes work a project
Separate projects from the ongoing work that keeps an organization running, and see why that line matters at handover.
Open learner explanation →Original project definitionThe source presents PMI’s definition of a project, then explains its temporary and unique characteristics through building, software, curriculum, product-design, hospital, humanitarian, and algorithm examples.
Source slides 2-8 Original organizational-work contentThe source contrasts projects with operations, introduces maintenance as a separate function using a water-pump example, and argues that operations and project work need different people, with operations involved throughout.
Source slides 9-15 Original irrigation exampleThe source’s video example describes a control room placed next to a village power plant to reduce cabling costs without consulting the eventual operator, meeting short-term goals but compromising long-term functionality.
Source slides 16-17 Lesson 02
Defining success: the triangle and beyond
Measure a project against cost, schedule, and quality, then add sustainability, treat safety as a given, and keep KPIs few.
Open learner explanation →Original success-measure contentThe source presents the iron triangle of cost, schedule, and quality, a chart of on-time and on-budget delivery across software, construction, and humanitarian projects, and sustainability as an emerging fourth dimension.
Source slides 18-24 Original safety and KPI contentThe source argues that safety is a given rather than an objective, defines KPIs against project objectives, and warns that too many KPIs dilute focus, especially on complex projects.
Source slides 25-31 Lesson 03
Programs, strategy, and tactics
See why related projects are grouped into programs, and how strategy and tactics connect them.
Open learner explanation →Original program-management contentThe source explains why related projects are grouped into programs, shows a program containing projects and other related work, and compares project and program management by focus, scope, timeframe, complexity, risk, and strategy.
Source slides 32-37 Original strategy, tactics, and examplesThe source defines strategy and tactics using a rural digital-education example, then contrasts projects and programs in humanitarian, software, and construction settings.
Source slides 38-47 Lesson 04
Portfolios and organizational project management
Move up a level: choose the right work, then connect projects, programs, and portfolios to strategy.
Open learner explanation →Original portfolio contentThe source defines a portfolio, lists selection criteria such as return on investment and strategic alignment, and shows a hierarchy combining programs, standalone projects, and other related work.
Source slides 48-52 Original OPM contentThe source presents organizational project management as the framework that guides portfolio, program, and project management, aligned with and driven by strategy, and bridging strategy and tactics.
Source slides 53-56 Original example and comparisonThe source uses a school, the Zahle Region Community Recovery program, and a Lebanon war-response portfolio as a worked example, then compares the three disciplines by definition, scope, objective, time horizon, and focus.
Source slides 57-64 Lesson 05
The project management office
Recognize supportive, controlling, and directive PMOs by how much control they exercise, and what else a PMO does.
Open learner explanation →Original PMO typesThe source defines the PMO and describes supportive, controlling, and directive PMOs, including what each provides and a figure ranking their level of control over projects.
Source slides 65-74 Original list of other PMO rolesThe source lists thirteen further PMO roles, from managing interdependencies and recommending termination to providing templates and sitting on change control boards.
Source slides 75-77 Lesson 06
Predictive, agile, or hybrid
Match the delivery approach to the project: lock definition early, adapt in cycles, or combine both.
Open learner explanation →Original predictive and waterfall contentThe source introduces predictive, agile, and hybrid approaches, then describes predictive project management and the waterfall sequence of requirements, design, implementation, verification, and maintenance.
Source slides 78-84 Original agile, Scrum, and hybrid contentThe source describes the agile approach and its plan, design, test, deliver, and feedback cycle; the Scrum flow from product backlog to finished work in one-to-four-week sprints; and when a hybrid approach fits.
Source slides 85-92 Lesson 07
From business objectives to project objectives
Start from why the project exists, then translate that into cost, schedule, and quality targets the team can deliver.
Open learner explanation →Original business-objective contentThe source defines business objectives as strategic drivers defined by the sponsor, gives typical growth, sustaining, regulatory, and sustainability objectives, and presents humanitarian project goals with seven outcome categories.
Source slides 93-103 Original translation and MoSCoW contentThe source explains how business objectives become project objectives with cost, schedule, and quality targets, and applies the MoSCoW method to an e-commerce platform.
Source slides 104-110 Lesson 08
Writing SMART project objectives
Replace “fast and cheap” with objectives that are specific, measurable, achievable, relevant, and time-bound.
Open learner explanation →Original vague-objective and SMART contentThe source explains why objectives like “fast and cheap” fail, then introduces the SMART framework and its five criteria.
Source slides 111-117 Original SMART criteria and examplesThe source works through specific, measurable, attainable, relevant, and time-bound objectives, each with vague and improved examples such as a Net Promoter Score target and a churn-reduction deadline.
Source slides 118-129 Source appendix
Where the deck needs a careful reading
Read with care
Program time horizonSlides 36-37 call programs “ongoing, potentially indefinite,” while the detailed comparison on slides 59-63 says programs are finite and end when their benefits are realized. The lessons follow the later comparison.
Who is “doing the right things”Slide 37 gives this phrase to program management. Slides 59-61 describe programs as “doing projects right, together” and portfolios as “doing the right projects.” The lessons use the later three-way framing.
Iron triangle labelsThe bullets on slide 23 say cost, time, and scope, while the figures on slides 19 and 23 and the objectives on slides 104-105 use cost, schedule, and quality. The lessons use cost, schedule, and quality.
On-time and on-budget chartSlide 21 gives no data source, date, or sample, and its notes limit it to showing how much the industry still has to do. The lessons treat it as directional, not as a benchmark.
Safety as a givenSlides 25-26 present safety as a given rather than an objective, explicitly as the instructor’s own view. The lessons present it as the course’s position.
Leftover headings and labelsSlides 33 and 49 carry front-end-loading headings over program and portfolio content, slides 44 and 46 are both labelled “Example-2,” and the notes on slide 12 say “maintenance” where they mean operations. The lessons teach the body content.
Checked against the source slides cited in each note.
What not to take away
The lessons actively work against these misreadings of the material:
- Any piece of work an organization does is a project.
- Operations can be consulted after the asset is handed over.
- Maintenance and operations want the same things from an asset.
- More KPIs mean better control.
- Safety is a target to trade off against cost and schedule.
- A program is simply a large project.
- Everything in a portfolio has to be related.
- Every PMO has the same authority over projects.
- Agile means the scope is never defined.
- One delivery method suits every project.
- “Fast and cheap” is a usable project objective.
- A specific, measurable goal is automatically worth pursuing.
Study-guide synthesis; each item is addressed in the lessons.