Project Management · Module 5 · Personality exercise reference

Exercise glossary

Terms as this exercise uses them. Where a term comes from the provider or from this module rather than the course, the source line says so.

16Personalities assessment

Guide §5 · [2]

The free online test the assignment uses. The guide recommends this name rather than the Myers-Briggs Type Indicator.

Review Part 2
NERIS model

Guide §5 · [2]

The provider’s name for its own model. It uses a familiar letter format but is not the official Myers-Briggs Type Indicator.

Review Part 2
Type code

Draft §1 · Guide §5

The letters that summarize a result, ending in A or T. It is reported in full, with the type name and the date.

Review Part 2
Trait pair

Draft §1 · Guide §5

One of five separate scales on which the result reports a side, such as Thinking or Feeling.

Review Part 2
Preference strength

Guide §6 · [2]

The percentage on a scale, showing the direction and strength of a reported preference. It is not a mark for competence.

Review Part 2
Near-midpoint result

Guide §6

A score close to the middle of a scale, which deserves a cautious reading.

Review Part 2
Identity scale

Guide §5 · [3]

The provider’s scale whose two alternatives are Assertive and Turbulent.

Review Part 2
Assertive and Turbulent

Guide §5 · [3]

The two alternatives shown by the final A or T of the code. The guide says they are not grades for management ability.

Review Part 2
Tendency

Guide §7 · [2]

How the provider describes a type: a tendency, not a definitive account of a person.

Review Part 3
Completion field

Draft notice · Guide §2

A bracketed blank in the draft, to be filled only with information you can personally confirm.

Review Part 1
Statement that needs context

Draft §2 · Guide §11

A profile description that fits some situations but not others, shown with a contrasting real example.

Review Part 3
Evidence-based reflection

Guide §8-9

A judgment supported by what actually happened, what you did and what you observed.

Review Part 3
Development action

Draft §3 · Guide §10

One behaviour you control, over a time period, linked to evidence you can review.

Review Part 4
Observable evidence

Guide §10

Something you can check afterwards, such as meeting notes or whether team members felt heard.

Review Part 4
Study connection

This module · Deck pp. 35-58

A link this module draws between the exercise and the Week 5 deck, which itself does not cover personality tests.

Review Part 5