What to record
Record three things: the type name, the full code and the date you completed the test. The final letter of the code is either A, for Assertive, or T, for Turbulent.
- Assertive and Turbulent are the two alternatives on the provider’s Identity scale.
- The guide is explicit that they are not grades for management ability.
Read with careThe provider calls its model NERIS. It uses a familiar four-letter format, but it is not the official Myers-Briggs Type Indicator, so the guide recommends calling it the 16Personalities assessment.
Five trait pairs, five questions
The result reports a side on each of five separate scales. The guide pairs each scale with a question to guide reflection. The questions are prompts for your own thinking, not findings about anyone.
| Trait pair | A question to guide your reflection |
|---|---|
| Extraverted / Introverted | What working and communication situations help me contribute? |
| Intuitive / Observant | How do I balance possibilities with concrete project information? |
| Thinking / Feeling | How do I consider both evidence and people in a decision? |
| Judging / Prospecting | How do I balance a clear plan with changing circumstances? |
| Assertive / Turbulent | How do I respond to feedback, uncertainty, and pressure? |
Applied choiceThe five reflection questions are the guide’s own prompts, not the provider’s or the course’s.
What a percentage means
Each percentage shows the direction and strength of a reported preference on one scale. It is not a mark for competence, and a result close to the midpoint deserves a cautious reading.
- Copy the side and the score together, exactly as displayed.
- Never add the five scores, or turn them into a claim such as being seventy per cent effective as a leader.
- The score table is optional, because a correct type and a well-supported reflection are worth more than guessed numbers.
Key ideaA score describes a preference. It says nothing about how well you manage a project.
Whose explanation this is
The guide draws on two of the provider’s own pages to explain the model. It adds a boundary worth keeping: those pages explain the provider’s model, and they are not an independent validation of it.
Read with careThis study page makes no claim about the test’s validity, and it does not describe any individual type. It explains only how to report and reflect on a result.
Key takeaways
- Record the type name, the full code including A or T, and the date.
- Assertive and Turbulent are two sides of one scale, not grades.
- The model is NERIS, not the official Myers-Briggs Type Indicator.
- A percentage shows the direction and strength of a preference, not competence; read midpoint results with care.
- Provider pages explain the provider’s model rather than validating it.