Design Principles · Week 2 reference
Glossary
Short definitions as the module uses them, each linked to the lesson it comes from.
- Typography
The arrangement of type to make language legible, readable and appealing, balancing form and function.
Review Lesson 1- Legibility
How easily individual letters can be told apart.
Review Lesson 1- Readability
How comfortably whole lines and paragraphs can be read.
Review Lesson 1- Baseline
The line most letters sit on.
Review Lesson 1- X-height
The height of lowercase letters without ascenders or descenders.
Review Lesson 1- Cap height
The distance from the baseline to the top of the capital letters.
Review Lesson 1- Ascender and descender
The parts of a letter that rise above the x-height (b, d, h) or drop below the baseline (g, p, y).
Review Lesson 1- Serif
A small stroke at the end of a letter’s main strokes; also the class of typefaces that have them.
Review Lesson 1- Sans serif
A typeface class without serifs, seen as clean, modern and versatile.
Review Lesson 1- Monospaced
A typeface in which every character takes the same width, like a typewriter.
Review Lesson 1- Kufic (Kufi)
The oldest Arabic style, named after Kufa: geometric, angular and bold.
Review Lesson 1- Naskh
The most common modern Arabic style, fluid and easy to read, used for books, news and long texts.
Review Lesson 1- Thuluth
An ornate, elongated Arabic style used for decorative art, monuments and headlines.
Review Lesson 1- Nasta’liq
A flowing style used mainly for Persian and Urdu, with short verticals and long horizontal strokes.
Review Lesson 1- Diwani
An intricate Ottoman-era Arabic style used for official and ceremonial documents.
Review Lesson 1- Typeface
A set of characters sharing one consistent design: the way the type looks.
Review Lesson 2- Font
One specific style, weight and size of a typeface, such as Helvetica 12pt Bold.
Review Lesson 2- Type family
A set of related typefaces varying in weight, width or style within one design.
Review Lesson 2- Typeface pairing
Using more than one typeface in a design, guided by contrast, hierarchy and balance.
Review Lesson 3- Hierarchy
The order in which a reader notices and reads information, set by size, weight or colour.
Review Lesson 3- Rule of three
The guideline to use no more than three typefaces in one design, with justified exceptions.
Review Lesson 3- Point (pt)
Typography’s unit of size, 1/72 of an inch, used mainly in print.
Review Lesson 4- Pixel (px)
The screen unit; on the web a CSS pixel is 1/96 inch, so 12pt = 16px.
Review Lesson 4- Kerning
Fine-tuning the space between two individual characters.
Review Lesson 5- Tracking
Adjusting letter spacing evenly across a word or line.
Review Lesson 5- Leading
The space between lines of text.
Review Lesson 5- Line length (measure)
The horizontal length of a line, counted in characters, spaces and punctuation.
Review Lesson 5- Kashida
The stretched connection between Arabic letters, used to lengthen words, including when justifying text.
Review Lesson 5- Tashkeel
Arabic diacritics: short vowels, sukun, shadda and tanween placed above or below letters.
Review Lesson 5