Four formatting levers
The deck introduces four things you format once the typeface and size are set. Spacing plays a critical role in readability and appearance. Alignment affects symmetry and balance. Line length sets reading comfort. Special characters, used correctly, mark professional work. None of these change the letters, yet each can make the same paragraph comfortable or tiring.
- Spacing: kerning, word spacing and leading.
- Alignment: left, centred, right, justified.
- Line length: how many characters fit on a line.
- Special characters: punctuation, symbols and diacritics.
Spacing: kerning, word spacing, leading
Kerning is the fine-tuning of space between individual characters: closing the gap in a pair like “AV” or “To” that would otherwise look loose. Word spacing balances the gaps between words so the eye can find word shapes without the line falling apart. Leading, named after the strips of lead once placed between lines of metal type, is the space between lines; enough leading lets the eye return to the start of the next line without slipping. The deck says to weigh audience, platform, typeface and language when you set them. Study note: tracking (letter spacing) is the related adjustment applied evenly across a whole word or line rather than to one pair. Tight tracking suits large headlines; wider tracking suits small capitals and short labels; body text is usually best left at the typeface’s default.
These samples change tracking across the whole line; kerning adjusts single pairs and can’t be shown with a generic font.
Leading in practice
Leading is easiest to judge by eye. Set too tight, the ascenders of one line crowd the descenders of the line above and the paragraph turns into a grey block. Set too loose, the lines drift apart and the paragraph stops reading as one unit. Lesson 4 listed adequate line spacing among the techniques for readers with visual impairments, and the line-length slide notes that adequate line spacing improves readability. Study note: for body text, a line height of roughly 1.4 to 1.6 times the font size is a common starting point; Arabic, with its taller marks and deeper descents, often needs a little more.
Alignment in Latin and Arabic
Alignment should follow the direction the reader’s eye travels. For Latin text, the deck’s principles are: left-aligned is the standard for readability, because every line starts at the same edge; centred is for emphasis and titles; justified gives a uniform block but needs careful handling. For Arabic, right-aligned is the standard because Arabic reads right to left, and centring and justification need special consideration. The deck then frames alignment as a balance between readability and aesthetics: alignment affects eye movement and so reading speed and comprehension; it should meet the reader’s cultural expectations; and misalignment risks confusion. Study note on justification: Latin justification widens the spaces between words, which can open distracting gaps; Arabic can instead stretch the connections between letters (kashida), which is why justified Arabic often looks more even.
Line length
Line length is the horizontal measure of a line of text, counting characters, spaces and punctuation. For English, the deck explains both failures. Too long strains the eye, as in a full-screen text editor with no margins, because the eye struggles to find the start of the next line. Too short interrupts the flow, as in narrow newspaper columns or cramped mobile layouts, because the eye jumps back too often. Just right is typically 60–70 characters per line in print (novels, textbooks) and 50–75 on screens (blogs, news sites, eBooks). For Arabic, the deck gives 20–30 characters in print (books, newspapers) and 15–25 on screens (websites, apps), with right-aligned or justified text and wide left alignment avoided. It ties line length to accessibility as well: larger font sizes may need shorter lines, and iterative testing with real users is the way to confirm the result. A slide of examples shows a landing page with short body blocks and an Arabic news page with a medium-width article column beside a narrow summary sidebar.
On a narrow phone screen the comfortable sample may wrap sooner; that is the mobile constraint the deck mentions.
Read with careRead with care: the Arabic ranges (20–30 characters in print, 15–25 on screen) are far shorter than the English ones and the deck cites no source. Report them as the deck states them, and confirm any Arabic measure by testing with Arabic readers.
Special characters and Arabic diacritics
Special characters are symbols and signs outside the alphabet: punctuation (commas, periods, colons, semicolons, question marks, exclamation points) and symbols such as @, & and #. The deck makes five points. They create visual pauses and structure, helping users navigate. They segment text and convey tone and emotion that plain text cannot. Designers use them creatively in logos, branding and interfaces. Conventions differ by language: in Arabic, special characters can have unique placements and shapes. And best practice is proper spacing around them, used in a way that fits the language and context. The slide’s Arabic example is a chart of diacritics (tashkeel): the short vowels fatha, kasra and damma, the sukun (no vowel), the shadda (a doubled consonant), and tanween (a doubled vowel ending). They sit above or below letters and change pronunciation and meaning, so they must be positioned cleanly. The logo examples show creative use: a “DASH” wordmark built from bars, a women’s gym mark combining “FIT” with the Arabic word for women, its hamza (ء) placed as a separate mark, and Arabic lettering credited to the Jozoor team. Study note: Arabic also has its own punctuation forms, such as the reversed comma (،) and question mark (؟).
| Role | What the deck says |
|---|---|
| Visual design | Create pauses and structure; a balanced, organized layout |
| Readability | Segment text; convey tone and emotion |
| Innovation | Logos, branding and interfaces use them creatively |
| Language | Arabic marks have their own placements and shapes |
| Best practice | Proper spacing; follow the language and context |
Key takeaways
- Spacing is more than style: kerning, word spacing and leading drive readability and guide the eye.
- Alignment affects balance and cognitive load: left for Latin text, right for Arabic, centred for titles, justified with care.
- Line length shapes comfort and speed: about 60–70 characters in print and 50–75 on screen for English.
- Special characters, including Arabic diacritics, add clarity when spaced and used correctly.