Design Principles · Week 2Summary

Module summary · 6 min

What you keep from Week 2

Week 2 gives you a sequence for every piece of text: know what you are looking at, choose a face that fits the context and audience, pair it with restraint, size it for the medium and the reader, and set it with care for spacing, alignment and line length, in Latin and in Arabic.

Listen to this lesson

Hear the lesson read aloud, with each sentence highlighted as you go.

Narrated by an AI voice.

One line per lesson

The five lessons in a sentence each.

  • 1 · What typography does Legible, readable, appealing; anatomy, classes and Arabic styles; tone, eye, readability.
  • 2 · Typeface, font, family Design, one style, the set; choose by context, content and audience.
  • 3 · Combining typefaces Contrast, hierarchy, balance; serif over sans, Kufic over Naskh; three at most.
  • 4 · Size and points 1pt = 1/72 inch, 12pt = 16px; start at 16px on screen; test for accessibility.
  • 5 · Formatting Kerning, leading, alignment by reading direction, 50–75 characters per line.

Skills to check

Before moving on, make sure you can do each of these without the slides.

  • Point to the baseline, x-height, cap height, an ascender and a descender.
  • Classify a typeface you see today as serif, sans, script, monospaced, display, handwriting or decorative.
  • Describe Kufic, Naskh, Thuluth, Nasta’liq and Diwani in a phrase each.
  • Say whether “Helvetica Bold 12pt” is a typeface, a font or a family.
  • Pair a heading face with a body face and justify it with contrast, hierarchy and balance.
  • Convert 18pt to pixels and 14px to points.
  • Explain why left alignment suits Latin body text and right alignment suits Arabic.
  • Name a comfortable English line length for print and for screen.

The decisions in order

Each choice narrows the next. Settle the face before the pairing, and the size before the spacing.

From brief to finished text · Decks W2 L1-L5
  1. Purpose and audienceWhat should the text feel like, and for whom?
  2. Class and typefaceSerif, sans, Naskh, Kufi…
  3. Family and pairingWeights first, then a second face
  4. SizeBody first, headings in clear steps
  5. Spacing and measureLeading, alignment, line length

Built from the Week 2 lecture decks; the module video they accompany was not supplied.

Your study checkpoint

Check what stuck

The practice page puts the module under pressure with realistic situations and a knowledge check.