Design Principles · Week 2Lesson 4

Study explanation · Lesson 04 · 14 min

Font size and the point system

Size is where legibility starts. This lesson explains the point (1/72 of an inch) and the pixel, how they convert (12pt = 16px), the deck’s size ranges for body text, headings and captions, and how audience, platform and accessibility shape the final choice. It also flags where the deck’s own numbers disagree.

Listen to this lesson

Hear the lesson read aloud, with each sentence highlighted as you go.

Narrated by an AI voice.

Points and pixels

The point is typography’s traditional unit: one point is 1/72 of an inch. The deck says it originated in the 18th century and became the standard measure in printing; slide 4 calls it “approximately” 1/72 inch, which is fair, since older point systems differed slightly and 1/72 is the modern digital point. Points are used in print, where they give consistency across printed media. Pixels are used for web and screen design, where they allow precise digital control. The deck notes that pixels vary with screen resolution, and that is true of physical device pixels. Study note: on the web, the CSS pixel is a fixed reference unit of 1/96 inch, which browsers scale for each screen. That is what makes conversion simple. With 72 points and 96 CSS pixels to the inch, one point is 4/3 of a pixel, so 12pt = 16px, 24pt = 32px, and 9pt = 12px.

Points to CSS pixels (×4/3) · Deck W2 L4, slides 3-4 and 12
PointsPixelsWhere the deck uses it
9pt12pxeBook footnotes
10.5pt14pxWeb caption, app comments
12pt16pxWeb and eBook body text
13.5pt18pxApp menu items
15pt20pxApp product titles
19.5pt26pxeBook chapter titles
24pt32pxWeb H1

Read with careAll seven pairs on slide 12 convert correctly.

The deck’s size ranges

Slide 5 gives ranges for each kind of text. Print body text: 10–12 points. Headings: H1 24–30pt (32–40px), H2 18–24pt (24–32px), H3 14–18pt (18–24px). Captions and footnotes: 8–10pt (10–13px). It adds two accessibility reminders: follow accessibility standards and use responsive design. The conversions in brackets are arithmetically right. The point of a range is the step between levels. Each heading level is clearly larger than the one below, so a reader can see the structure without reading it. The specimen below sets one example from each range.

A size scale from the deck’s ranges · Deck W2 L4, slides 5 and 12
H1 · 32px (24pt)
Main heading
H2 · 24px (18pt)
Subheading
H3 · 20px (15pt)
Sub-subheading
Body · 16px (12pt)
Body text at sixteen pixels reads comfortably on most screens.
Caption · 13px (about 10pt)
Caption and footnote text

Shown at CSS pixel sizes on your screen.

Where the deck’s numbers disagree

Read the size slides side by side and three inconsistencies appear. Knowing them will stop you copying a number that doesn’t fit. First, web body text. Slide 5 says web body text is “15–18 points (20–24 pixels).” Slide 8 says “16px for body text is a common starting point,” slide 9 says a “minimum of 16px,” and slide 12’s web article uses 16px. Read 16px (12pt) as the baseline and 20–24px as a larger, comfortable range for reading-heavy pages; the Medium article on slide 5 uses 21px body text. Second, print in pixels. Slide 5 gives print body text as “10–12 points (13–16 pixels).” The conversion is right, but print is specified in points; the pixel figure only tells you what the same size would be on screen. Third, the examples versus the table. The Medium screenshot labels a Heading 3 at 34px and a caption at 16px, both outside the slide’s own H3 (18–24px) and caption (10–13px) ranges, and slide 12’s captions are 14px. Ranges are starting points; real products tune them.

Read with careRead with care: slide 5 is titled “for Digital Design” but begins with print sizes, and no source is given for any range. Treat the numbers as rules of thumb and test on real devices.

What changes the right size

Small fonts strain the eyes and lower readability; very large fonts break the reading flow and use too much space. Between the two, the deck lists the factors that move your choice: the audience (age, vision, preferences), the platform (web, mobile, tablet), the context of use (long reading, headlines, captions), the content (language complexity, line length, paragraph structure), the device’s resolution and screen size, accessibility standards, and responsiveness across devices. Slide 8 condenses it: print usually 10–12pt for body text, web 16px as a starting point, mobile responsive; larger fonts for older audiences; consider users with visual impairments.

Choosing a body size · Deck W2 L4, slides 6 and 8
  1. Start from the mediumPrint 10–12pt · web 16px
  2. Adjust for the audienceOlder readers, low vision: larger
  3. Adjust for the contentLong reading, line length, language
  4. Test on devicesResponsive, readable everywhere

Before and after: size, weight and clutter

Three ✗/✓ slides turn the advice into pictures. A “Summer Camping 2023” poster set in a thin, spidery decorative script with an unreadable tagline is marked wrong; the same poster in heavy, condensed sans capitals is marked right. The advice: avoid overwhelming text, no fine print on social media (small text gets skipped), make headers prominent, and preview on different devices. A motivational line, “Don’t wish for it, work for it,” set in three clashing faces is marked wrong; the same line in one clean sans is marked right: limit your fonts, often one is enough, and let the font serve the message. The third pair is about images. “Be you” in black over white paper boats is marked wrong; the same words with “you” in the red of the one red boat are marked right. Contrast is key, dark backgrounds take light text and light backgrounds take dark text, and picking a colour from the image ties text and picture together.

Contrast decides legibility · Deck W2 L4, slides 9 and 11
Dark on light
Be you
Strong contrast: the deck’s baseline.
Light on dark
Be you
“Dark background? Go light with your text.”
Low contrast
Be you
Hard to read for everyone, and worse with low vision.

Read with careRead with care: slide 7 advises sans serif fonts “in dense text areas for clearer readability.” That is a common rule of thumb, especially on screens, not a settled finding; many books are set in serif faces. Choose a face designed for text, test it, and keep the size generous.

Designing for visual impairments

Slide 9 lists techniques for web and mobile: larger font sizes (a minimum of 16px for web body text, responsive sizes on mobile), strong contrast between text and background, simple and clear typefaces, alternative text for images that screen readers can announce, adequate line spacing, and testing. For testing it names WAVE, axe and ChromeVox on the web, and VoiceOver (iOS), TalkBack (Android) and Accessibility Scanner on mobile.

  • Body text at least 16px on the web, and responsive on mobile.
  • High contrast between text and background.
  • A simple, clear text face.
  • Alt text for meaningful images.
  • Adequate line spacing.
  • Checked with a web tool (WAVE, axe) and a screen reader (ChromeVox, VoiceOver, TalkBack).

Read with careRead with care: the same slide recommends “justified alignment” for readers with visual impairments. Lesson 5’s deck says justified text “needs careful handling” and left alignment is the standard for readability. Study note: justified Latin text stretches the spaces between words unevenly, which many readers find harder, and WCAG’s highest-level visual presentation criterion (1.4.8) asks that text not be justified. For accessible Latin text, use left alignment; Arabic is right-aligned by default.

Sizes in three real layouts

Slide 12 applies the system to three layouts. A web article: body 16px (12pt) for comfortable reading, H1 32px (24pt) for clear hierarchy, captions 14px (10.5pt). A mobile app (a dark banking interface): menu items 18px (13.5pt) for easy navigation, product titles 20px (15pt) for emphasis, user comments 14px (10.5pt). An eBook: main text 16px (12pt), chapter titles 26px (19.5pt), footnotes 12px (9pt). Notice that the body sits at 16px in all three, and that the steps to headings are large enough to see at a glance: double the body in the article, more than 1.5 times in the eBook.

The deck’s three applied examples · Deck W2 L4, slide 12
LayoutLargest textMiddle levelBodySmallest
Web articleH1 32px (24pt)—16px (12pt)Caption 14px (10.5pt)
Mobile appProduct titles 20px (15pt)Menu items 18px (13.5pt)—Comments 14px (10.5pt)
eBookChapter titles 26px (19.5pt)—16px (12pt)Footnotes 12px (9pt)

Key takeaways

  • 1 point = 1/72 inch; with 96 CSS pixels to the inch, 12pt = 16px.
  • Use points for print and pixels for screens; convert when a workflow crosses the two.
  • Start body text at 10–12pt in print and 16px on the web; give headings clear steps above it.
  • Adjust for audience, platform, content and accessibility, then test on real devices.

Built from the Week 2 lecture decks; the module video they accompany was not supplied.

Your study checkpoint

Ready to continue?

Mark the lesson complete once you have read it and tried its idea on something real.

Next · Lesson 5