Original source guide

Week 2 · Typography

Where each lesson comes from, what was not supplied, and the places where the material needs a careful reading.

The sources

This week is built from five supplied lecture decks, all “module video” slides in one template: W2 L1 “Introduction to Typography” (15 pages, deck Lesson 1, opening with a placeholder for the week’s module video), W2 L2 “Typefaces, Fonts & Type Families” (11 pages, Lesson 2), W2 L3 “Combining Typefaces” (8 pages, Lesson 3), W2 L4 “Picking a font size & the point system” (14 pages, Lesson 4) and W2 L5 “Formatting Typography” (9 pages, Lesson 5). The lesson numbering is complete, so no Week 2 lesson is missing. Not supplied: the module video itself, and so any narration, demonstration or walkthrough of the example images. The decks contain no exercises; the practice questions and scenarios are this library’s. Images on the slides are described, not reproduced, and private individuals credited for posters are not named.

Listening

Every page in this course is read aloud by your device’s own voice. No recorded narration was generated for it. Back to the lessons

Lessons and their source slides
LessonDeckSlides
1 · What typography doesW2 L1 Introduction to Typography1-15
2 · Typeface, font and type familyW2 L2 Typefaces, Fonts & Type Families1-11
3 · Combining typefacesW2 L3 Combining Typefaces1-8
4 · Font size and the point systemW2 L4 Picking a font size & the point system1-14
5 · Formatting: spacing, alignment, line lengthW2 L5 Formatting Typography1-9

Lesson 01

What typography does

Typography is the arrangement of type so that language is legible, readable and appealing. This lesson gives you the vocabulary to look at type closely: the anatomy of a letter, the seven Latin classes and the main Arabic script styles, and the four jobs type does in a user experience.

Open the lesson
Definition and role

Legible, readable, appealing; form and function; the gaming and school sites.

Deck W2 L1, slides 1-3
Choosing the right fonts

Bank in script vs heavy sans; Flower Store in heavy sans vs script.

Deck W2 L1, slides 4-5
Anatomy of type

Labelled “Typography” diagram and five defined parts.

Deck W2 L1, slide 6
Latin classifications

Five classes in text, seven in specimens.

Deck W2 L1, slides 7-9
Arabic classifications

Six styles described, five shown with the same phrase.

Deck W2 L1, slides 10-11
Typography and user experience

Four roles with brand and banner examples; takeaways and reflection.

Deck W2 L1, slides 12-15

Lesson 02

Typeface, font and type family

Three words people use interchangeably mean different things. A typeface is the design, a font is one specific style, weight and size of it, and a type family is the set of related styles. Knowing which you mean helps you choose by context, content and audience, and use a family to get variety without chaos.

Open the lesson
Distinguishing the terms

Definitions with Times New Roman and Naskh specimen tables.

Deck W2 L2, slides 2-3
Typefaces and fonts

Times New Roman and Helvetica views; Kufic and Naskh lines; Good Morning and صباح الخير.

Deck W2 L2, slides 4-5
Type families

Five Helvetica styles and five Naskh styles.

Deck W2 L2, slide 6
Selecting and applying

Context, content, audience; Kufic invitation, rounded birthday invite, Fredoka; legibility, medium, message.

Deck W2 L2, slides 7-8
The power of families

Farahat Design poster and a landing page in one family.

Deck W2 L2, slide 9
Takeaway and reflection

Three recap headings; “I will find you” in two moods.

Deck W2 L2, slides 10-11

Lesson 03

Combining typefaces

Most designs use more than one typeface. Good pairings rely on contrast, hierarchy and a balance between legibility and aesthetics, and usually stop at three faces. The deck shows the same principles at work in Latin (serif heading, sans body) and Arabic (Kufic heading, Naskh body).

Open the lesson
Definition and importance

Mashq Conference website as a bilingual example.

Deck W2 L3, slides 1-2
Key principles

Contrast, hierarchy, balance, each with a poster.

Deck W2 L3, slide 3
Pairing examples

Playfair Display with Montserrat; Kufic with Naskh.

Deck W2 L3, slide 4
Rule of three

Brand examples and two cluttered signs.

Deck W2 L3, slide 5
Colour and alignment

Women’s Day poster and Cairo Prints poster.

Deck W2 L3, slide 6
Takeaways and reflection

Arabic poster, wine page, Rabie typeface; “Using too many fonts is bad.”

Deck W2 L3, slides 7-8

Lesson 04

Font size and the point system

Size is where legibility starts. This lesson explains the point (1/72 of an inch) and the pixel, how they convert (12pt = 16px), the deck’s size ranges for body text, headings and captions, and how audience, platform and accessibility shape the final choice. It also flags where the deck’s own numbers disagree.

Open the lesson
Introduction and the point system

1/72 inch, 18th-century origin, digital relevance.

Deck W2 L4, slides 1-3
Points vs pixels

Definitions, when to use each, conversion.

Deck W2 L4, slide 4
Size ranges

Body, headings and captions in points and pixels; Medium screenshot.

Deck W2 L4, slide 5
Readability factors and practical choices

Audience, platform, context, content; 16px starting point.

Deck W2 L4, slides 6-8
Visual impairments

16px minimum, contrast, alt text, spacing, testing tools.

Deck W2 L4, slide 9
Before-and-after examples

Summer Camping, Don’t wish for it, Be you.

Deck W2 L4, slides 7, 10-11
Applied examples and wrap-up

Web article, mobile app, eBook; takeaways and reflection.

Deck W2 L4, slides 12-14

Lesson 05

Formatting: spacing, alignment, line length

Once the face and size are chosen, formatting decides how comfortable the text is to read. This lesson covers kerning, word spacing and leading; left, centred, right and justified alignment in Latin and Arabic; line length in both scripts; and the special characters, including Arabic diacritics, that structure a text.

Open the lesson
Introduction

Spacing, alignment, line length, special characters.

Deck W2 L5, slides 1-2
Spacing

Kerning, word spacing, leading; factors to consider.

Deck W2 L5, slide 3
Alignment in Arabic and Latin

Left, centred, justified; right-aligned Arabic; readability and expectations.

Deck W2 L5, slide 4
Line length

English and Arabic ranges, accessibility, two page examples.

Deck W2 L5, slides 5-6
Special characters

Definitions, roles, Arabic diacritics chart, three logos.

Deck W2 L5, slide 7
Takeaway and reflection

Four one-line takeaways and five questions.

Deck W2 L5, slides 8-9

Source appendix

Where the material needs a careful reading

Read with care

The module video was not supplied

W2 L1 opens with a video placeholder and several slides read like presenter notes (“Discussion on…”, “Showcasing examples…”) or carry leftover authoring notes such as “(IMAGE - Left)”. What the video said about the examples is unknown; the lessons describe only what the slides show.

Web body size: two figures

W2 L4 slide 5 gives web body text as “15–18 points (20–24 pixels)”, while slides 8, 9 and 12 use 16px (12pt) as the starting point, the minimum and the example. The lessons teach 16px as the baseline and present 20–24px as a larger option.

Print sizes in pixels, and examples outside the ranges

Slide 5 gives print body text as “10–12 points (13–16 pixels)”: the conversion is correct, but print is set in points. Its Medium screenshot (Heading 3 at 34px, caption 16px) and slide 12’s 14px captions fall outside the slide’s own H3 and caption ranges. All conversions on slide 12 are arithmetically correct (×4/3).

Justified alignment for accessibility

W2 L4 slide 9 recommends “justified alignment” for readers with visual impairments; W2 L5 slide 4 calls left alignment the Latin standard and says justified text needs careful handling. The lessons follow Lesson 5 and add, as a study note, that WCAG’s criterion 1.4.8 asks that text not be justified.

Class counts and examples vary

W2 L1 lists five Latin classes on slide 7 and seven on slides 8-9; Jokerman is display on one slide and decorative on the other; Blackletter appears as a display example. Slide 10 describes six Arabic styles, slide 11 shows five (no Maghrebi).

Terms and labels used loosely

The deck that teaches typeface, font and family labels samples “Kufic Font”, “Naskh Font” and “Helvetica Font”, and defines a font as “style and size” on one slide and “style, weight, and size” on another. The lessons use the fuller definition.

Images that don’t match their captions

The “Diwani type family” poster (W2 L2 slide 9) shows condensed angular lettering, not Diwani; the road-sign photo is not demonstrably Helvetica; slide text says “Flower Shop” while the images read “Flower Store”.

Arabic line length

W2 L5 gives 20–30 characters per line for Arabic in print and 15–25 on screen, much shorter than the English ranges, without a source. The lessons report the figures and recommend testing with Arabic readers.

Rules of thumb, not findings

The rule of three, “sans serif for dense text”, the size ranges and the line lengths carry no sources. The point is defined as 1/72 inch, the modern digital value; the deck’s “18th century” origin is stated without detail.

Arabic specimens on your device

Live samples use your device’s single generic Arabic font, so they show weight, size and alignment but not Kufic, Thuluth, Nasta’liq or Diwani. Those differences are described in words and tables.

Checked against the supplied documents cited in each note.

What not to take away

The lessons actively work against these misreadings:

  • Typography is decoration added once the content is done.
  • “Font” and “typeface” mean exactly the same thing.
  • Two fonts at the same point size look the same size.
  • Any typeface works for any brand if the logo is well drawn.
  • Kufic, Naskh and Thuluth are just different Arabic fonts with the same uses.
  • More typefaces make a design more interesting.
  • Pairing rules apply only to Latin script.
  • A point and a pixel are the same size.
  • 12px is a normal size for web body text.
  • Justified text is always the most readable and accessible.
  • The longer the line, the faster you read.
  • Arabic layouts can simply mirror a left-aligned English page without changing alignment.

Study-guide synthesis; each item is addressed in the lessons.