Project Management · Module 4 · Exercise reference

Glossary

Short definitions as the submission and its companion explanation use them.

Binary decision

Strategy 01

A choice recorded as 0 or 1: stay out of a game, or invest in it.

Review Part 1
Adopted allocation

Strategy 02

An allocation taken from the supplied file rather than selected independently before the results were known.

Review Part 2
Saved outcome

Submission · Strategy 03

The values stored in the uploaded workbook, as opposed to the result of a newly played trial.

Review Part 1
Expected net value

Strategy 02

Each outcome's net result weighted by its probability. For the Supplier Deal under the stated reading it is zero.

Review Part 2
Break-even probability

Strategy 02

The chance of success at which an expected value turns positive. For the Penalty Contract it is one third.

Review Part 2
Payoff ratio

Strategy 02

The size of a possible gain compared with a possible loss. It says nothing about how likely either is.

Review Part 2
Downside exposure

Submission

What can be lost if the unfavourable outcome occurs, regardless of the expected value.

Review Part 2
Conditional protection

Strategy 02

Cover that pays only when a defined loss occurs, bought here for a 10-credit premium.

Review Part 2
Coverage question

Strategy 02

An unresolved rule about protection: which losses qualify, and whether more than one can be covered.

Review Part 2
Input dependency

Strategy 03

A formula reading another decision's cell, as C4 and C6 both read B2.

Review Part 3
Correlation

Strategy 03

A shared random movement between outcomes. Sharing an input is not evidence of it.

Review Part 3
RANDBETWEEN(0,1)

Strategy 03

The spreadsheet function in the random cells. Because it recalculates, a reported result must be identified as saved.

Review Part 3
Model limitation

Submission · Strategy 03

A disclosed difference between a game's written description and the calculation that actually runs.

Review Part 3
Traceability

Strategy 01

Identifying the workbook and cells behind each reported figure, so a reader can check them.

Review Part 1
Decision process versus outcome

Strategy 05

Judging how a choice was made rather than how it turned out. The exercise grades the first.

Review Part 5