What the saved file stores
The uploaded file stores the three decisions as 1, and the three payouts as 2, 5 and 100. Adding the stored payouts gives 107 credits. That verifies a snapshot and an arithmetic total; it does not verify a new trial or the intended economics of the games. The companion records that the original file was inspected without recalculating or changing it.
Where the rules and the calculations part company
Each payout cell was checked against the game it is supposed to implement. Three of the five findings concern which decision actually drives the result.
| Workbook evidence | Meaning for the explanation |
|---|---|
| C2 is the fixed number 2 | It does not calculate the stated Supplier payoff, and is not driven by the decision in B2 or the random value in I2 |
| C4 uses B2 and I4, not B4 or a loss amount | The insurance selection does not control this payout. With B2 = 1 it returns 5 or 20, rather than 50% of an identified contract loss |
| C6 uses B2 and I6, not B6 | With B2 = 1 it returns 100 or 0, not the stated 100 or −50. With B2 = 0 it returns 50. The Penalty selection itself is never referenced |
| I2, I4 and I6 use RANDBETWEEN(0,1) | Each holds 1 in the saved file. Recalculating can change the random values and the formula-based payouts, so a saved result must be identified as saved |
| A8 describes a Joint Venture; B8 and C8 are blank | No fourth configured decision or outcome exists, so the three-game boundary holds |
The two formulas, as they stand
The companion reproduces the dependent payout formulas for traceability, and is explicit that they are not proposed corrections.
From the workbookC4 = IF(B2=0,IF(I4<0.9,-10,20),IF(I4>0.5,5,20)) · C6 = IF(B2=0,50,IF(I6>0.5,100,0))
Key ideaChanging B4 or B6 does not switch the associated payout on or off. That is the heart of the problem: the file cannot demonstrate the effect of all three investment decisions, because two of them are never read.
Why not call it profit, or quietly fix the file
Two tempting shortcuts are both refused. The outputs do not consistently represent the stated receipts, costs and losses, so subtracting the 40 credits of stated costs from 107 to report 67 in profit would be unjustified. Repairing the formulas would replace the supplied model with an assumed one, and the results would no longer describe the exercise that was set.
Key ideaThe defensible action is to preserve the source, disclose the mismatch, and obtain clarification before using a corrected trial.
Key takeaways
- The file proves a saved snapshot and an addition, and nothing about the intended economics.
- C2 is a constant, and C4 and C6 read the Supplier decision rather than their own.
- Random cells mean a recalculated sheet is a different result, so saved must be labelled saved.
- Sharing an input is not the same as being correlated.
- Preserve, disclose and ask, rather than reporting a profit or silently repairing the model.