Project Management · Module 4Investment simulationPart 2

Applied exercise · Part 02 · 14 min

What the three choices mean

One balanced gamble, one paid protection and one lopsided payoff whose probability nobody supplied. The reasoning is in the assumptions, not in the result.

Listen to this lesson

Hear the lesson read aloud, with each sentence highlighted as you go.

Narrated by an AI voice.

Adopted, not independently chosen

The draft invests in all three games, which preserves the allocation already in the workbook. The companion is careful about what that does and does not show: it does not establish that the choices were independently selected before the results were known, and no starting budget or personal risk tolerance was supplied. What follows explains the trade-offs rather than claiming that investing in all three is the best strategy.

Supplier Deal: a balanced gamble

The description offers a 50% chance of earning 60 credits after investing 30, and a 50% chance of losing the investment. The narrative reads 60 as the total receipt rather than an additional profit, so success is a net gain of 30 and failure a net loss of 30. Stating that interpretation matters, because reading “earn 60” as net profit would change the arithmetic.

Worked exampleExpected net value: 0.50 × (60 − 30) + 0.50 × (−30), which comes to 0 credits, so the deal only breaks even on average.

Key ideaZero expected value does not mean zero risk. A loss remains possible, so investing expresses a willingness to accept the gamble rather than an advantage over declining it.

Insurance Clause: paying for conditional protection

The written rule charges 10 credits to recover 50% when another contract is lost. The reason to include it is potential loss reduction, not a guaranteed return. The coverage questions are left open by the description: which losses qualify, and can more than one loss be covered?

Worked exampleIllustration only: if the clause covered a 30-credit Supplier loss that happened half the time, expected recovery would be 0.50 × 15 = 7.5 credits, which is less than the 10-credit premium.

Read with careThat illustration assumes coverage the description does not confirm, and the workbook does not implement a loss-based calculation at all. It can still be reasonable to buy protection to reduce downside, but not on the claim that it maximizes expected profit.

Penalty Contract: a payoff is not a probability

The written outcomes are a 100-credit gain or a 50-credit loss. A larger possible gain is not proof of a high chance of success, and the description never supplies that chance. What can be worked out is the point where the bet turns positive.

Worked exampleWith p as the chance of success, and the amounts treated as net outcomes with no entry cost: 100p − 50(1 − p) = 150p − 50, which becomes positive when p exceeds one third.

Key ideaOne third is a break-even threshold, not an estimate. It tells you what you would need to believe about p, which is a different thing from knowing it.

Why the combination matters

The three decisions are not three separate opportunities. Insurance introduces a possible protection relationship, and in the workbook the coded payouts also depend on the Supplier investment input. The narrative acknowledges those dependencies rather than treating three selections as automatic diversification; it does not demonstrate that the portfolio is optimal or that the intended protection works.

Key takeaways

  • The allocation was adopted from the file, not chosen independently beforehand.
  • Under the stated reading, the Supplier Deal has an expected net value of zero.
  • Zero expected value still carries real downside.
  • Protection has a price, and can reduce downside without improving expected value.
  • A payoff ratio does not supply a probability; p above one third is the break-even point.
  • Dependencies between the games rule out treating them as diversification.

Study explanation of a one-page academic submission and its companion explanation. The workbook is not published here, and the recorded 107 credits is a saved value rather than verified profit.