Where each part comes from, and exactly how far the workbook evidence goes.
The two documents
A one-page submission, dated for a 27 September 2026 deadline, and its companion explanation of five spreads. The companion is explicitly a study and discussion guide rather than part of the upload. Neither document is republished here.
Where the course connects
The Week 4 deck does not describe this exercise. The module points to the deck's risk dimension and its rate-based schedule incentives as the nearest course ideas, and labels those links as connections rather than course claims. Open the risk dimension →
Part map · Submission and companion
Part
Sources
1 · The submission
Companion 01 Structure and purpose; the submission itself
2 · The three decisions
Companion 02 Decision logic
3 · What the file proves
Companion 03 Evidence and limitations; the submission's model-limitation note
4 · The 200 words
Companion 04 Narrative design; the submission's narrative
5 · Finishing it
Companion 05 Learning and final checks
What the workbook evidence rests on
Item
Status
Saved decisions and payouts (1, 1, 1 and 2, 5, 100)
Quoted from the companion, which inspected the file without recalculating it
The C4 and C6 formulas
Quoted for traceability; not corrections, and not re-executed here
The 107-credit total
An arithmetic sum of saved values, reported as a payout and never as profit
The game descriptions (A2, A4, A6)
Quoted as written; they disagree with the coded payouts, and neither side is treated as authoritative
The workbook file itself
Not in this repository and not published here
The expected value, the 7.5-credit illustration and the one-third threshold
The companion's own calculations, reproduced rather than recomputed
Part 01
The submission, and why it is built that way
The exercise grades the reasoning, not the result. So the page keeps the evidence and the explanation apart, and labels the outcome as a saved snapshot rather than a fresh trial.
Three binary decisions, a reported outcome and a 200-word narrative on one PDF page, graded on the narrative.
Strategy 01 · its evidence [1, 2]
Why each part is included
The six parts of the page and the job each one does.
Strategy 01
The recorded outcome
The adopted allocation, the three saved payouts and the 107-credit total.
Submission
The structure caution
A sensible structure does not prove the requirement is met; the snapshot still needs clarification.
Strategy 01
Part 02
What the three choices mean
One balanced gamble, one paid protection and one lopsided payoff whose probability nobody supplied. The reasoning is in the assumptions, not in the result.
Investing in all three preserves the supplied allocation and does not establish independent selection; no budget or risk tolerance was given.
Strategy 02
Supplier Deal
The 50/50 description, the total-receipt interpretation and the zero expected net value.
Strategy 02 [3: A2]
Insurance Clause
10 credits for 50% recovery, the open coverage questions and the 7.5-credit illustration.
Strategy 02 [3: A4]
Penalty Contract
100 gain or 50 loss, and the 150p − 50 break-even at one third.
Strategy 02 [3: A6]
The combination
Protection relationships and the payouts' dependency on the Supplier decision.
Strategy 02 [3: C4, C6]
Part 03
What the workbook can prove
The file records a snapshot and an arithmetic total. It does not record a fresh trial, and its formulas do not implement the games as they are described.
B2, B4 and B6 all 1; payouts 2, 5 and 100; total 107; inspected without recalculation.
Strategy 03 [3]
The model issues
The five findings on C2, C4, C6, the random cells and the blank Joint Venture row.
Strategy 03
The formulas
C4 and C6 as written in the workbook, reproduced for traceability.
Strategy 03 [3: C4, C6]
Interpretation limits
Shared input dependency versus correlation, and why 107 is not reported as profit.
Strategy 03 · Submission's limitation note
Part 04
How the 200 words work
Four paragraphs, each with a job: the objective and what was adopted, the assumptions and the cost of protection, the downside and the dependencies, and finally the evidence, its limits and the lesson.
The four paragraphs, their word counts and the purpose of each.
Strategy 04
The narrative itself
The 200-word strategy narrative as submitted.
Submission
Why the reflection is longest
The assignment grades reasoning rather than winning, so the closing paragraph carries the learning.
Strategy 04 [1, 2]
Part 05
Finishing it, and explaining it
What the exercise is really assessing, what it has in common with a real contracting decision, and the five things that still have to happen before the page is submitted.
Finding solutions, solving a problem and deciding under uncertainty, mapped to what the explanation shows.
Strategy 05
The project-management connection
A supplier opportunity, a paid protection clause and a delivery penalty, with terms, exposure and authority clarified before commitment.
Strategy 05
Before submission
The five remaining steps, including confirming the required evidence and clarifying the intended model.
Strategy 05
The spoken explanation
The short discussion answer and the narrative's closing lesson.
Strategy 05 · Submission
Source appendix
How far the evidence goes
Read with care
The workbook is not published
Every cell value and formula quoted in this module comes from the companion explanation, which recorded them from the original file without recalculating or changing it. If the workbook is added later, these claims can be verified directly.
Descriptions and formulas disagree
The written rules and the coded payouts do not match. The module reports the mismatch and treats neither as the authoritative version of the game.
107 is a saved payout
It is never profit, never winnings, and never evidence that the strategy worked. The companion also refuses the alternative of subtracting stated costs to report 67.
The probabilities are unknown
Only the Supplier Deal's even chance is stated. One third is the Penalty Contract's break-even threshold, not an estimate of its actual probability.
The insurance illustration is conditional
The 7.5-credit figure assumes coverage the description does not confirm, and the workbook does not implement a loss-based calculation at all.
The allocation was adopted
Investing in all three games preserves the allocation already in the file. It does not establish that the choices were selected independently before the results were known.
An exercise in progress
The companion lists five things that still have to happen before submission, including confirming whether a fresh trial is required. This module reports them as open, not settled.
Not investment advice
Expected value, downside and protection are discussed here as reasoning about a spreadsheet exercise.
Checked against the submission and its companion explanation.
What not to take away
The parts actively work against these misreadings:
A favourable total proves the strategy was sound.
A payoff ratio tells you the probability of success.
Zero expected value means there is no risk.
Buying protection always improves expected value.
Three decisions automatically mean diversification.
Sharing an input makes two outcomes correlated.
A saved spreadsheet value is the same as a played trial.
Repairing a supplied model quietly is a neutral act.
Study-guide synthesis; each item is addressed in the parts.