Seven parts, seven lines
The notes close with a recap table. It is the fastest way back into the module before a task or a discussion.
| Part | In one line |
|---|---|
| 1 · Thinking layer | Direct AI, don’t just use it — the thinking outlasts any tool. |
| 2 · How it works | It predicts text, it doesn’t look up facts — so verify. |
| 3 · Strengths | Great with words; weak on exact facts, recent or private information, and accountability. |
| 4 · Task breakdown | Break big asks into small, checkable steps. |
| 5 · Context | Give it your world — the right briefing, signal not volume. |
| 6 · Prompting | A clear prompt is role plus task plus audience plus format plus example. |
| 7 · Reusable asset | Save the brief once, add a Definition of Done, and reuse it forever. |
The pair you keep
The notes end on the deliverable rather than on a summary: keep your assistant specification and your Definition of Done together. That pair is the Module 1 deliverable, and the notes describe it as the seed of the next module in the course.
Key ideaYou bring the thinking; the assistant drafts inside the lines you draw. Everything in the module is a way of drawing those lines more clearly.
Where to go next
Three pages carry the module forward: the hands-on turns a messy real week into a brief, the reading list follows each part into the sources the course recommends, and Module 2 adds the check that runs before anyone approves the result.
- Hands-on: Lina’s week Five messy sources, one brief. Build the specification and run the Definition of Done against it.
- Further reading The course’s own core, practical and optional readings, mapped to the parts they support.
- Module 2: the compliance auditor The eight-check rubric, the audit loop and a log that ends in PASS or BLOCKED. Its hands-on audits the brief you produce here.