Project Management · Module 4 reference
Glossary
Short, source-grounded definitions to use alongside the learning path.
- Owner
The entity that will ultimately take possession of the asset or product and that funds the project, even with borrowed money.
Review Lesson 1- Contractor
A party paid by the owner to execute all or part of the scope; it does not own the project and aims to make a profit.
Review Lesson 1- Financier
A lender, such as a bank, investment institution, or government-backed lender, that provides debt financing, expects repayment, and keeps oversight.
Review Lesson 1- Subject matter expert (SME)
A consultant hired by the owner for technical, contractual, or financial advice, who influences decisions but does not execute the work.
Review Lesson 1- Supplier
A vendor providing materials or equipment, contracted by the owner or through a contractor, usually for only part of the scope.
Review Lesson 1- Long-lead item
A good that takes more than a year to manufacture or deliver, whose supplier should be involved early, in design and engineering.
Review Lesson 1- Owner’s representative
An entity hired to act for the owner during execution, often called the Consultant or the Engineer. It does not replace the owner.
Review Lesson 1- Contract structure
The dimension of contracting that answers “who will do what?”, including single-entity or multi-prime choices.
Review Lesson 2- Multi-prime model
A structure in which responsibility is shared among several contractors instead of one accountable entity. In the design-bid-build diagram, the owner may hire multiple prime contractors instead of one general contractor.
Review Lesson 2- Prequalification
A step that allows only contractors with the necessary experience, financial capacity, and technical capability to bid.
Review Lesson 2- Sole sourcing
Awarding a contract directly to a specific contractor without competitive bidding, for example on specialized or urgent projects.
Review Lesson 2- Open invitation and limited bidding
Inviting the broader market to bid, or limiting bidding to a shortlist of pre-identified or invited contractors.
Review Lesson 2- Project risk
An uncertain event or condition that, if it materializes, impacts at least one project objective, such as scope, schedule, cost, or quality.
Review Lesson 2- Governing law and jurisdiction
What a dispute resolution clause should name if amicable efforts fail and arbitration or litigation follows.
Review Lesson 2- Statement of work (SOW)
The description of the work a seller must deliver; for fixed price contracts it must be detailed enough to price.
Review Lesson 3- Fixed price contract
A contract for a predetermined total price, in which the seller absorbs cost overruns and the buyer gains cost predictability.
Review Lesson 3- Fixed price incentive fee (FPIF)
A fixed price contract whose incentive adjusts for meeting performance criteria, such as finishing early.
Review Lesson 3- Fixed price plus award fee (FPAF)
A fixed price plus a performance award, decided by a procedure set in advance.
Review Lesson 3- Fixed price with economic price adjustment (FPEPA)
A multiyear fixed price contract that allows adjustment for economic change, such as a consumer price index or material costs.
Review Lesson 3- Graduated fixed price
An agile contract that shares schedule risk and reward through a rate that changes with early, on-time, or late delivery.
Review Lesson 3- Purchase order
The simplest fixed price contract, normally unilateral, signed by one party.
Review Lesson 3- Reimbursable contract
A contract paying actual costs incurred, usually plus a fee, used when scope is unclear; it shifts financial risk to the buyer.
Review Lesson 4- Time and material (T&M)
Payment per hour or per item for work whose level of effort can’t be defined; the rate is fixed but the total is unknown.
Review Lesson 4- Not to exceed (NTE)
A clause limiting the total amount a buyer must pay under a time and material contract.
Review Lesson 4- Allowable costs
The incurred costs a cost-reimbursable contract says the buyer will pay.
Review Lesson 4- Cost plus fixed fee (CPFF)
Actual costs plus a fee fixed before work begins, which does not vary with actual costs.
Review Lesson 4- Cost plus incentive fee (CPIF)
Actual costs plus a fee tied to performance, with a target cost and target fee, and savings or overruns shared.
Review Lesson 4- Cost plus award fee (CPAF)
Costs plus a base fee plus a performance award, with the award procedure set in advance.
Review Lesson 4- Cost plus percentage of cost
All costs plus a percentage of costs as the fee; not allowed for US federal acquisitions and, the deck says, bad for buyers everywhere.
Review Lesson 4- Design-bid-build
The traditional delivery method: the owner contracts an architect/engineer and a general contractor separately.
Review Lesson 5- Architect/engineer (A/E)
The design entity the owner hires, usually referred to as the consultant.
Review Lesson 5- Design-build
A delivery method in which one entity, a firm or joint venture, provides both design and construction.
Review Lesson 5- Trade contractor
A contractor focused on one discipline, such as electrical, mechanical, or civil work.
Review Lesson 5- Agency CM
A construction manager working for a fixed fee as the owner’s agent, extending the owner’s capabilities.
Review Lesson 5- CM at risk
A construction manager that holds the trade contracts, bears cost and schedule risk, and usually guarantees a maximum price.
Review Lesson 5- Guaranteed maximum price (GMP)
The budget within which a CM at risk guarantees to complete the project.
Review Lesson 5- Public-private partnership (PPP)
A long-term contractual collaboration in which a private partner designs, builds, finances, operates, or maintains public infrastructure or services.
Review Lesson 6- Value for money
The core PPP objective: weighing life-cycle cost, innovation, and risk transfer, not just the cheapest bid.
Review Lesson 6- Build-operate-transfer (BOT)
A PPP model in which the private partner designs, finances, builds, and operates an asset for a set period, then transfers it to the public sector.
Review Lesson 6- DBFO, LDO, and concession
PPP models in which the private firm handles nearly everything except ownership (DBFO), leases and upgrades an existing facility (LDO), or operates and maintains infrastructure for a set time (concession).
Review Lesson 6- Mediation
A voluntary, confidential, and flexible process in which a neutral mediator facilitates, but does not impose, a solution.
Review Lesson 7- Arbitration
A formal process in which a private tribunal hears both sides and delivers a binding decision.
Review Lesson 7- Litigation
The formal court route for resolving a dispute, often lengthy, expensive, and public.
Review Lesson 7- Expert determination
A method, increasingly used on software projects, in which a neutral technical expert assesses the issue.
Review Lesson 7- FIDIC
A standard form contract that the deck names as including built-in dispute resolution mechanisms.
Review Lesson 7