AI-Assisted Coding · Module 3Summary

Module summary · 6 min

What you keep from Module 3

A working Kanban frontend on the Module 2 API, and the evidence that you built it responsibly: a verified setup, a behavior contract that held through a refactor, tests proven by breakage, and a debugging log of decisions.

Listen to this lesson

Hear the lesson read aloud, with each sentence highlighted as you go.

Narrated by an AI voice.

One line per lesson

Each lesson adds one layer to the product and one habit to the workflow.

  • 1 · Backend to product UI Correctness now includes the browser and DevTools; the backend still owns the rules.
  • 2 · Set up the assistant Setup is done when a route summary checks out against app/main.py.
  • 3 · Kanban board Layers in order; drag-and-drop last, with PATCH and an honest revert.
  • 4 · Create/edit modal Trim before sending, keep the modal open on 422, clear on every exit.
  • 5 · Safe refactor Contract, commit, one selected section, read the diff, re-check.
  • 6 · Test and debug One test at a time, proven by breakage; fix the source, never the test.
  • 7 · Pitfalls and deliverables Recover by narrowing; deliver a working UI plus evidence.

Deliverables and their evidence

Tick each only when the evidence exists, not when the feature seems to work.

  • VS Code and Copilot open on the right repo, with one answer verified against app/main.py.
  • frontend/index.html with three columns, priority sorting, fetch/render and all four UI states.
  • Drag-and-drop that persists valid moves through PATCH and reverts with a message on rejection.
  • A create/edit modal with title trimming, POST/PATCH, server 422 handling and four dismissal paths.
  • An eight-item behavior contract that passed before and after the refactor, with a pre-refactor commit.
  • New PATCH edge-case tests, at least one proven through deliberate source breakage.
  • A four-line debugging log and a short reflection, including a brief comparison of the AI tools and workflows used so far.

The chain the module builds

Each step relies on the one before it being verified.

From a verified assistant to a logged decision · Study-guide synthesis of Lessons 1-7
  1. Verified setupRoute summary checked
  2. BoardLayers, states, PATCH
  3. ModalTrim, POST/PATCH, 422
  4. Contract + refactor8 items before and after
  5. Proven testsFail on breakage
  6. Debugging logEvidence and decision

Built from the Module 3 lecture notes, prompt library and additional readings; the module videos and slides were not supplied.

Your study checkpoint

Check what stuck

The practice page puts the module under pressure with realistic situations and a knowledge check.