Original source guide

Week 3: The Project Charter

This map preserves the deck’s teaching sequence while the lessons provide a clearer, learner-facing explanation. Use it to trace every study topic back to the supplied source.

How to use this page

Open a lesson source note for its original teaching focus and slide range. Slide numbers are PDF page numbers, because the deck’s speaker notes run onto extra pages. The deck itself is not republished here; distribute the original PDF only when you hold the necessary rights.

Applied case

A separate applied case reads one proposed charter against these lessons, with its own source guide for the charter, its companion guide, and the deck pages each part applies. Open the case source guide

Lesson 01

What a project charter is, and why you need one

A charter is the outcome of high-level planning that formally authorizes a project, and six reasons explain why no project should start without one.

Open learner explanation
The charter as a process

The charter is the result of the planning work done during the definition phase, built on the assumptions and constraints identified then. It formally authorizes the project and should be broad and stable.

Source slides 2-4
What changes after signing

Detailed planning happens only after the charter is signed, and additional resources are committed only after official authorization. Any change to the charter should call into question whether the project continues.

Source slides 2-4
Six reasons for a charter

The deck lists authority and ownership, stakeholder alignment, high-level scope, connection to business objectives, a reference throughout the project, and faster startup. Its bullet list places business objectives before scope, while the notes number scope third.

Source slides 5-8

Lesson 02

What goes into a charter

Ten components make up a strong charter, and the difference between a charter and a project plan explains how much detail each one needs.

Open learner explanation
The ten components

Two tables list the title and description, business need, objectives and success criteria, scope overview, assumptions and constraints, high-level timeline and budget, stakeholder list, roles and responsibilities, risks and dependencies, and approval and sign-off, with notes on each.

Source slides 9-12
The table as a summary

The video slide notes that most charters are multiple pages long and restates what a charter should include.

Source slide 13
Charter versus plan

A table compares charter and plan on timing, purpose, detail level, owner, and scope, and the notes say the two are often confused.

Source slides 14-15
Best practices

A cycle diagram shows aligned, clear, comprehensive, and concise. The notes add that the more complex the project, the simpler the charter needs to be.

Source slides 16-17

Lesson 03

Why charters matter, and who writes and signs them

A charter aligns people, formally authorizes the work, and acts as both compass and guardrail. The project manager drafts it, and the sponsor approves and owns it.

Open learner explanation
Alignment and shared understanding

The charter connects the project to business objectives, clarifies purpose and desired outcomes, aligns stakeholders on high-level goals, and sets a unified baseline for scope and priorities.

Source slides 19-20
Authorization and accountability

Issuing a charter is a formal commitment from leadership that authorizes the project manager, defines roles, and holds stakeholders accountable.

Source slides 21-22
Compass and guardrail

The charter keeps the team on its original goals and sets boundaries that help prevent scope creep, giving a reference point for assessing proposed changes.

Source slides 23-24
Agile and predictive charters

The video slide contrasts a lightweight Lean Charter or Project Canvas that may evolve with a formal, comprehensive predictive charter, both serving the same core purpose.

Source slides 25-26
Who develops and approves the charter

Project managers create charters, sponsors approve and sign them, key stakeholders contribute, and team members may be consulted.

Source slides 27-29

Lesson 04

Risks in the charter: naming the uncertainty

A charter captures a high-level snapshot of the risks that could stop a project meeting its objectives, and the deck gives five ways to find them early.

Open learner explanation
Risk as uncertainty

Risks are events that, if they materialize, could affect meeting the objectives, and failing to meet objectives might jeopardize the business case.

Source slides 31-32
Internal and external risks

Internal risks are technical, organizational, or process risks and are more controllable; external risks, such as regulatory or market risks, are typically beyond the team's control.

Source slides 33-34
What the charter records

The slide lists a description, classification, a quantitative impact summary, assumptions and dependencies, and optional ownership; the notes describe impact as high, medium, or low.

Source slides 35-36
Collecting early risks

Stakeholder interviews, lessons learned, assumption testing, environmental scans, and expert judgment are the deck's five collection methods.

Source slides 37-39

Lesson 05

Assessing early risks: Delphi, the risk matrix, and priorities

Gather honest views anonymously with Delphi, place risks on a simple likelihood and consequence matrix, and focus attention on the most serious threats.

Open learner explanation
Delphi

A moderator runs anonymous electronic rounds of idea generation and comment until a general consensus is reached.

Source slides 40-41
Qualitative risk classification

A two-by-two matrix estimates likelihood and consequences by expert judgment or stakeholder interviews, without detailed quantitative analysis at this stage.

Source slides 42-43
Risk prioritization

Risks are prioritized by probability and impact; acts of God are often low priority and technical risks such as unproven technology often high.

Source slides 44-45

Lesson 06

Stakeholders in the charter

Stakeholder management runs through the whole project, but the charter captures an early snapshot and uses power, interest, legitimacy, and urgency to decide who needs attention.

Open learner explanation
Defining a stakeholder

A stakeholder is any group or individual with an interest in, or affected by, the project, and may be internal or external.

Source slide 47
Stakeholder management as a continuous process

A twelve-step flow runs from identifying stakeholders to monitoring communication and stakeholder involvement.

Source slide 48
Stakeholders in the charter

The charter gives a high-level view of stakeholders, recording names or roles, position, influence or interest, concerns, and engagement needs.

Source slides 49-52
Power/interest grid

The grid labels quadrants actively consult, regularly engage, keep informed, and maintain interest; the notes describe high-high as closely managed and low-low as monitored with minimal effort.

Source slides 53-55
Salience model

Legitimacy, power, and urgency classify stakeholders, with those holding all three given the highest priority; the diagram repeats the demanding label.

Source slides 56-57

Lesson 07

Delegation of authority: deciding within limits

The charter spells out which decisions the project manager and others can make, up to what limit, and when a decision must go to the sponsor.

Open learner explanation
Defining delegation of authority

Decision-making power is formally assigned from a higher authority so people can decide, approve, or commit resources within defined boundaries.

Source slides 59-60
What the charter specifies

Decision types, escalation points, financial or contractual limits, and usually a table or matrix showing them.

Source slides 61-63
Example delegation table

The example sets limits for budget, scope, schedule, resources, contracts, and risk responses, with sponsor approval above each limit.

Source slides 64-66
Why delegation matters

Delegation prevents bottlenecks, speeds responses, promotes ownership, and supports decentralized decisions.

Source slides 67-68

Lesson 08

Responsibility, authority, and the RACI chart

Separate the obligation to deliver from the right to decide, and use a RACI chart alongside the delegation of authority to show who does what and who decides what.

Open learner explanation
Responsibility versus authority

Responsibility is the obligation to deliver; authority is the right to decide or allocate resources. Clarifying both prevents holding people accountable for decisions beyond their control.

Source slides 69-70
RACI and delegation of authority

A RACI chart shows who is responsible, accountable, consulted, and informed; the delegation of authority shows who decides and under what conditions.

Source slides 71-72
RACI template

A template RACI for a humanitarian project covers needs assessment, procurement, aid distribution, and financial reporting across four roles.

Source slide 73

Source appendix

Where the deck needs a careful reading

Read with care

A stable charter or an evolving one

Slides 2-4 say the charter should be broad and stable, and that any change should call into question whether the project continues. Slide 7 calls it a “living point of reference,” and slides 25-26 say agile charters may evolve. The lessons teach stability as the predictive default and flag the agile difference.

Quantitative or qualitative impact

Slide 35 lists a “Quantitative Impact Summary,” while its notes describe impact noted as high, medium, or low, and slides 42-43 say no detailed quantitative analysis happens at this stage. The lessons teach a high-level impact rating.

Power/interest grid wording

The grid on slide 53 labels low power and low interest “Keep Informed,” while the notes on slide 54 say that corner can be monitored with minimal effort. The lessons follow the grid’s labels.

Risk matrix axes

The grid on slide 42 labels only the likelihood axis. Its notes supply consequences as the second dimension, and the lessons follow the notes.

Salience diagram labels

The diagram on slide 56 labels both the power-only and urgency-only areas “Demanding Stakeholder,” so the power-only area has no distinct name in this deck. The lessons show the labels as given.

Prioritizing acts of God

Slides 44-45 rank risks by probability and impact, but explain the low priority of natural disasters partly by their being outside the team’s control. The lessons flag that reason.

RACI template

On slide 73 the final row is labelled with a role, “Finance Officer,” rather than an activity, and the “Prepare Financial Report” row marks no one as Responsible. The lessons show the template as given and flag both.

Leftover headings and illustrative limits

Slide 2 carries the title “What is a Project?” over charter content, slide 5 orders its bullets differently from the notes, and the dollar and week limits in the slide 64 example are illustrations rather than benchmarks.

Checked against the source slides cited in each note.

What not to take away

The lessons actively work against these misreadings of the material:

  • A charter is a one-off document written on a single day.
  • Detailed planning can start before the charter is signed.
  • A charter and a project plan are the same thing.
  • The more complex the project, the longer the charter should be.
  • The project manager both writes and approves the charter.
  • Every change to the charter is routine.
  • A charter needs a full, quantitative risk management plan.
  • Only stakeholders who show interest need to be listed.
  • Delegating authority means the sponsor gives up oversight.
  • Being responsible for a task gives you authority over it.
  • A RACI chart replaces the delegation of authority.

Study-guide synthesis; each item is addressed in the lessons.