Agentic AI · Module 4Module summary

Module summary · 6 min

What you keep from Module 4

One skill, five Mental Model cards and one deliverable: a workflow you can run any week without reinventing it.

Listen to this lesson

Hear the lesson read aloud, with each sentence highlighted as you go.

Narrated by an AI voice.

The whole module in one minute

The notes close with each part in a single line.

Module 4 in one line per part · Lecture notes p. 7
PartIn one line
0 · Why it mattersThe steps work, but you are still the wiring, until the task becomes a shape you can see.
1 · The four momentsEvery workflow is input, process, decision and output.
2 · Diagram and tableDraw the blueprint, and document its twin so someone else could run it.
3 · Design patternsChain, route, parallelize, orchestrate, evaluate, and pick the smallest shape that fits.
4 · Vibe coding and loopsDescribe it, let AI build it, verify the translation, and give every loop a stop rule.
5 · Putting it togetherNumber the stations, name the handoffs, build in the gates and assign the tools.

Five Mental Model cards

The module adds cards 16 to 20 to the course’s set.

  • #16 · See the four moments Input arrives, process transforms it, decision forks it, output delivers.
  • #17 · Draw the blueprint A diagram and its twin table, with every dependency and failure point named.
  • #18 · Choose the shape Chain, router, parallel, orchestrator, evaluator; pick the smallest that fits.
  • #19 · Say it, don’t code it Describe it, verify the translation, and always define stop rules.
  • #20 · Assemble the workflow Number, name, give fail paths and stop conditions, and assign tools.

Your Module 4 deliverable

The notes ask you to keep four things together. As one bundle, they are a workflow you can run any week without reinventing it.

  • Your workflow diagram.
  • Your documentation table.
  • The patterns you chose.
  • The stop rules for your loops.

The line to leave with

The notes’ closing takeaway names the skill the whole module teaches.

Key ideaThe skill is making the task a visible, repeatable shape. You stop being the wiring between steps; the workflow holds the order, the checks, and the handoffs for you.

Where to go next

The notes say Module 5 goes further, with agents running your loops on real schedules and connected to your real tools; Module 5 is next in this library. Three pages carry this module forward.

  • Hands-on: Lina’s weekly workflow The source pack, the standards, the audit gate and the output contract for building the workflow in Codex.
  • Prompt library The hands-on chain H1 to H8 for Codex, six foundation prompts and four guardrails, each as a weak and an improved version.
  • Further reading Five core readings, four Codex references and four optional dives, mapped to the module’s parts.

Recap of the supplied Module 4 lecture notes, pages 1 to 7.

Your study checkpoint

Build the workflow

The hands-on walks through Lina’s source pack, standards, audit gate and output contract, station by station. The practice page checks what stuck.