- Schedule management plan
The approach to managing the schedule, set early: methodology, tools, baseline development and control, variance thresholds, reporting frequency, and iteration length.
Review Lesson 1- Planning
Determining the ways, means, and steps required to carry out a job.
Review Lesson 1- Scheduling
Showing on a calendar the steps that result from planning.
Review Lesson 1- Work breakdown structure (WBS)
A visual, hierarchical breakdown of the project into manageable chunks of work.
Review Lesson 1- Work package
The lowest level of the WBS, roughly two weeks or 80 hours of work or less, with an owner on the project team.
Review Lesson 1- Milestone
A significant event in the schedule, not a work activity, with no duration.
Review Lesson 1- Rolling wave planning
A form of progressive elaboration in which activities are planned in detail just before that part of the project starts.
Review Lesson 1- Network diagram
An image of the project’s activities in the logical order in which they will be performed.
Review Lesson 2- Activity on node
A network diagram in which activities are boxes and arrows show precedence.
Review Lesson 2- Activity on arc
A network diagram in which arrows are activities and nodes mark their start and finish.
Review Lesson 2- Finish to start
The most common relationship: the predecessor finishes before the successor starts.
Review Lesson 2- Start to start
The predecessor must start before the successor can start.
Review Lesson 2- Finish to finish
The predecessor must finish before the successor can finish.
Review Lesson 2- Mandatory dependency
Hard logic: inherent in the nature of the work, or required by a contract.
Review Lesson 3- Discretionary dependency
Soft or preferential logic: the organization’s chosen way of working, which can be changed, for example to fast track.
Review Lesson 3- External dependency
A dependency based on the needs of a party outside the project, such as the government or suppliers.
Review Lesson 3- Internal dependency
A dependency based on the needs of the project, which the team can control.
Review Lesson 3- Lead
Allowing an activity to start before its predecessor is completed.
Review Lesson 3- Lag
Waiting time inserted between activities.
Review Lesson 3- Path convergence and divergence
An activity with two or more direct predecessors, or with two or more direct successors.
Review Lesson 3- Relative sizing
Estimating from previously completed work, often in story points, on adaptive projects.
Review Lesson 4- Parametric estimation
Estimating with equations from historical records: regression, learning curves, or heuristics.
Review Lesson 4- Analogous estimation
A rough, top-down estimate of the overall duration from similar historical projects.
Review Lesson 4- Bottom-up estimation
Detailed estimates for each part of the WBS, rolled up into control accounts and the project estimate.
Review Lesson 4- Schedule model
All the data needed to calculate the schedule: activities, durations, dependencies, leads, and lags.
Review Lesson 5- Schedule baseline
The approved schedule, part of the project management plan, changed only through change management.
Review Lesson 5- Resource calendar
A record of when resources are available.
Review Lesson 5- Critical path
The longest path through the network diagram, which governs the project’s duration; its activities have zero float.
Review Lesson 6- Total float
How long an activity can be delayed without delaying the project end date or a milestone: LS − ES, or LF − EF.
Review Lesson 6- Free float
How long an activity can be delayed without delaying its successor’s early start: next ES − current EF.
Review Lesson 6- Project float
How long the project can be delayed without missing its imposed completion date.
Review Lesson 6- Negative float
A sign that the project is already late, or that its completion constraints are unrealistic.
Review Lesson 6- Forward and backward pass
Calculating early dates from the start, then late dates from the end, to find each activity’s float.
Review Lesson 6- Fast tracking
Performing critical activities planned in sequence in parallel; often adds rework and risk.
Review Lesson 7- Crashing
Adding or adjusting resources to compress the schedule while keeping scope; always adds cost.
Review Lesson 7