With activities listed and estimated, the schedule model can be built. Once approved it becomes the baseline. A good schedule is calendar based, approved, realistic, and inclusive, and it draws on a long list of inputs, from scope to the risk register.

Listen to this lesson

Hear the lesson read aloud, with each sentence highlighted as you go.

Narrated by an AI voice.

The schedule model

After listing the activities and estimating their durations, the schedule model can be prepared. It contains all the data needed to calculate the schedule: activities, duration estimates, dependencies, leads, lags, and more.

  • The schedule is represented in two ways: bar charts and milestone lists.
  • The approved schedule is called the baseline. It cannot be changed without the change management procedure.
  • The schedule becomes part of the project management plan.

Key ideaRe-baselining is not easy, because it falls under the project’s change management procedure.

What a schedule needs to be

The deck gives four characteristics of a schedule.

  • Calendar based So the team knows the working days and the availability of resources across the life of the project.
  • Approved So the team can use it when executing the project.
  • Realistic So the team can achieve it, and takes it seriously.
  • Inclusive Of all the activities needed to complete the work, with enough contingency reserve to manage risk.

A long list of inputs

To prepare an effective schedule, the deck lists what has to be in place first.

  • A clear project scope, broken down into detailed activities.
  • The key milestones.
  • The activity dependencies, the logical relationships between tasks.
  • A solid scheduling basis.
  • Resource estimates: what, and how much, each activity needs.
  • Historical records from similar projects, so the team builds on what it already knows.

What else the planner needs

Resources and risk complete the picture.

  • Resource calendars When resources are available, which is why schedules must be calendar based.
  • Resource breakdown structure The required resources by category.
  • Company calendar The organization’s working and non-working days.
  • Project team assignments Resources already assigned to specific activities by management, or by agreement or contract.
  • Risk register The risks that could affect the schedule, so the planner can include enough buffers and reserves.

Key ideaAlways remember that schedules are dynamic, and preparing them is an iterative process.

Key takeaways

  • The schedule model holds activities, durations, dependencies, leads, and lags.
  • Schedules are shown as bar charts and milestone lists.
  • The approved schedule is the baseline, changed only through change management.
  • A good schedule is calendar based, approved, realistic, and inclusive of contingency.
  • Inputs run from scope and dependencies to resource calendars and the risk register; scheduling is iterative.

Study explanation based on the supplied Week 6: Scheduling source deck. Open the source notes above for slide-level traceability.

Your study checkpoint

Ready to continue?

Mark the lesson complete after you have read, reflected, and tested the main idea.

Next · Lesson 6