Project Management · Module 06 · Week 6

Module 6 · Scheduling

Building a project schedule step by step: the schedule management plan, the work breakdown structure, sequencing and dependencies, estimating durations, the schedule model, the critical path method, and schedule compression.

Time seems to be the hardest outcome to manage on capital projects, and most of them slip. Week 6 follows the process that produces a realistic schedule: define the activities, sequence them, estimate their durations, schedule them, and keep controlling the result once the work begins.

  • Schedule plan
  • WBS
  • Sequencing
  • Dependencies
  • Estimation
  • Critical path
  • Compression

Module introduction

A schedule is the final outcome of planning.

The deck treats the schedule as the final outcome of project planning. It is built in phases, from a breakdown of the work to a network of dependencies, a set of duration estimates, and a calendar-based baseline. The critical path then shows which activities govern the finish date, and compression shows what to do when that date cannot be met.

Scheduling projects: a process · Source slides 9-10
  1. DefiningThe required activities
  2. SequencingTheir precedence relationships
  3. EstimatingEach activity’s duration
  4. SchedulingThe overall duration and dates
  5. ControllingThroughout execution

Your learning path

Define the work, then find the path that decides the date.

Open source guide
01Scheduling basicsA schedule starts with a plan for managing it and a breakdown of the work. This lesson covers the schedule management plan, the five-step scheduling process, the work breakdown structure, work packages, milestones, and rolling wave planning.22 min02Activity sequencingWith the activities defined, the next step is their order. Sequencing sets the precedence relationships between activities and produces a network diagram, drawn either with activities on nodes or on arcs, and linked finish to start, start to start, or finish to finish.14 min03DependenciesThe precedence relationship between two activities depends on the type of dependency between them. Dependencies are mandatory or discretionary by logic, and internal or external by the party requesting them; leads and lags fine-tune the links, and the result is a well-formed network diagram.15 min04Activity estimationThe goal of scheduling is the project’s duration, so each activity needs a duration estimate. The deck covers relative sizing, one-point estimates, parametric estimation, analogous top-down estimates, and bottom-up estimates built from the WBS.14 min05Preparing the scheduleWith activities listed and estimated, the schedule model can be built. Once approved it becomes the baseline. A good schedule is calendar based, approved, realistic, and inclusive, and it draws on a long list of inputs, from scope to the risk register.12 min06The critical path methodThe critical path method finds the longest path through the network, which governs the project’s duration. A forward pass gives each activity’s early dates, a backward pass its late dates, and their difference is float. The deck works one example through from start to finish.24 min07Schedule compressionWhen a schedule constraint cannot be met as things stand, the schedule can be compressed. Fast tracking overlaps critical activities and adds risk; crashing adds resources and always adds cost. The deck works through both and compares them with reducing scope and cutting quality.16 minApplied case: the critical path, calculatedA seven-activity network solved step by step: the split and the merge, both passes, float, and what would change the 22-day answer.CaseWhat Week 6 is really teachingThe seven lessons as one scheduling chain, with a quick reference for revision.Summary