What Week 6 is really teaching

A schedule is built, not guessed. Week 6 moves from a plan for managing time, through a breakdown, a sequence, and a set of estimates, to a baseline whose critical path shows where time can and cannot be recovered.

Listen to this lesson

Hear the lesson read aloud, with each sentence highlighted as you go.

Narrated by an AI voice.

A schedule is built, not guessed

Read as a whole, the Week 6 deck treats a realistic schedule as the result of a chain of decisions. This page is a study-guide synthesis of the seven lessons and adds no new facts. In those terms, building a schedule means answering seven questions.

  • How will we manage time Lesson 1 sets the schedule management plan before any schedule exists.
  • What is the work Lesson 1 breaks the scope into a WBS of owned work packages and milestones.
  • In what order Lesson 2 sequences the activities into a network diagram.
  • Why that order Lesson 3 classifies the dependencies and adds leads and lags.
  • How long Lesson 4 estimates each duration, from analogous to bottom up.
  • On which dates Lesson 5 builds the schedule model and approves the baseline.
  • What decides the finish, and how to recover Lessons 6 and 7 find the critical path and compress it when needed.

From management plan to a schedule you can defend

One way to hold the whole week in mind is as a chain, each step feeding the next. The chain loops: once execution starts, controlling the schedule may call for compression.

Building a schedule you can defend · Study-guide synthesis of Lessons 1-7
  1. Schedule management planMethod, tools, thresholds, reporting · Lesson 1
  2. Work breakdown structureOwned work packages and milestones · Lesson 1
  3. Network diagramPrecedence relationships and dependencies · Lessons 2 and 3
  4. Duration estimatesFrom analogous to bottom up · Lesson 4
  5. Schedule model and baselineCalendar based, approved, realistic, inclusive · Lesson 5
  6. Critical path and floatWhat governs the finish date · Lesson 6
  7. Control and compressFast track or crash when a date is at risk · Lesson 7

Quick reference

Use these four groups for revision. Each line links to the lesson section that teaches it.

Defining the work

Schedule management plan
Method, tools, baseline control, variance thresholds, reporting, iterations.
Five steps
Defining, sequencing, estimating, scheduling, controlling.
Work package
Lowest WBS level; two weeks or 80 hours at most; has an owner.
Milestone
A significant event with no duration, used to measure progress.

Sequencing and dependencies

Finish to start
The most common: the predecessor finishes before the successor starts.
Mandatory or discretionary
Hard logic from the work or a contract, or the organization’s preference.
Lead and lag
Start before the predecessor ends, or wait between activities.
Convergence and divergence
Two or more predecessors, or two or more successors.

Estimating and the schedule

Analogous
Top down from similar projects; rough, early, by sponsors.
Bottom up
Detailed estimates from the WBS, rolled up through control accounts.
Baseline
The approved schedule, changed only through change management.
Four characteristics
Calendar based, approved, realistic, inclusive.

Critical path and compression

Total float
LS − ES, or LF − EF; zero on the critical path.
Forward and backward pass
ES = largest predecessor EF; LF = smallest successor LS.
Fast tracking
Overlap critical activities; adds risk and rework.
Crashing
Add resources; always adds cost; crash the cheapest month first.

Study-guide synthesis of the supplied Week 6: Scheduling source deck. It adds no new facts; each quick-reference line links to the lesson that teaches it.