Week 7: Costing and Control

This map preserves the deck’s teaching sequence while the lessons provide a clearer, learner-facing explanation. Use it to trace every study topic back to the supplied source.

How to use this page

The source is the Week 7 course deck by Dr. Daoud Kiomjian, American University of Beirut. Open a lesson source note for its original teaching focus and slide range. Slide numbers are PDF page numbers, because the deck’s speaker notes run onto extra pages. The deck itself is not republished here, and its diagrams are redrawn rather than copied; distribute the original PDF only when you hold the necessary rights.

Study-guide syntheses

Four elements connect the deck’s ideas rather than quoting it: the cost process in Lesson 1, the method comparison in Lesson 3, the class spectrum in Lesson 4, and the Week 7 summary. Lesson 6’s forecast for the work package is labelled as a calculation. Each adds no new facts. Open the Week 7 summary

Lesson 01

Costing basics

Cost has to be estimated before it can be controlled, and an unrealistic estimate can never be controlled. This lesson covers what to settle before estimating, local content rules, the cost management plan, and what a project estimate must include.

Open learner explanation
Why do we care

Cost as a pillar of success; estimate, then control; an unrealistic estimate cannot be controlled.

Source slides 3-4
Hold on a minute

Financing, equipment funding, and economic calculations.

Source slides 5-6
Local content requirements

Local sourcing and hiring rules; the 30 and 10 dollar wage example.

Source slides 7-8
Planning cost management

The fourteen elements of a cost management plan.

Source slides 9-11
Project estimation

What to estimate, and not to forget, including contingency and escalation.

Source slides 12-13

Lesson 02

Cost categories

Costs can be sorted by their source, direct or indirect, and by their variability, fixed or variable, and a single cost belongs to both. Materials divide into equipment and bulk materials. The lesson ends with two terms every estimate needs: the material takeoff and the quotation.

Open learner explanation
Basic cost categories

By source and by variability; not mutually exclusive.

Source slides 15-16
Direct versus indirect costs

Definitions, the concrete slab example, head office and executive costs.

Source slides 17-18
Categorize the following

Project manager, CEO and design engineer.

Source slide 19
Fixed versus variable costs

Definitions and the four-cost exercise.

Source slides 20-22
Material cost categories

Equipment and bulk materials, with examples.

Source slides 23-24
A couple of definitions

Material takeoffs and quotations.

Source slide 25

Lesson 03

Cost estimation best practice

A good estimate rests on the latest documents, real quantities, recent quotes and market rates. This lesson covers the deck’s best practices, the inputs to the estimating process, top-down and bottom-up estimation, and a house-pricing exercise that asks what is still missing.

Open learner explanation
Cost estimation best practices

Latest documents, takeoffs, quotes, market rates, few factors.

Source slides 27-28
Estimation methods: what do we need

The inputs to the estimation process.

Source slides 29-30
Top-down analogous estimation

Advantages and disadvantages.

Source slides 31-32
Bottom-up estimation

Advantages and disadvantages.

Source slides 33-34
What else do you need

The house exercise: wage rates and the exchange rate.

Source slide 35

Lesson 04

Estimate accuracy

Estimates are graded by how much of the project is defined when they are made. The AACE classes run from class 5, a concept screening estimate made in under an hour, to class 1, a detailed check estimate for parts of the project. The right class depends on the decision the estimate supports.

Open learner explanation
AACE cost estimate classes

Why the industry grades estimates; five classes; certificates.

Source slides 37-38
AACE estimate classes table

Definition, usage, methodology and accuracy by class; class 1 not always needed.

Source slides 39-40
Class 5 estimates

Very limited information; less than an hour.

Source slides 41-42
Class 4 estimates

Screening and feasibility; 1% to 15% engineering.

Source slides 43-44
Class 3 estimates

Budget authorization and the initial control estimate.

Source slides 45-46
Class 2 estimates

Detailed control baseline and contractor bids.

Source slides 47-48
Class 1 estimates

Discrete parts, check estimates, the current control estimate.

Source slides 49-50

Lesson 05

Project controls fundamentals

Control tracks time, money, resources, materials and tasks, not cost alone. This lesson covers when to monitor, and the earned value method: planned value, earned value and actual cost, the variances and indices built from them, and the forecasts of the final cost.

Open learner explanation
Project controls and monitoring

Inputs and outputs of control.

Source slide 52
Monitoring frequency

Eight moments to monitor.

Source slides 53-54
How do we monitor

EVM definitions from PMI and Moreira and Figueiredo.

Source slides 55-56
Earned value terms, part 1

PV, AC and EV.

Source slide 57
Earned value terms, part 2

CV, SV, CPI and SPI.

Source slides 58-60
Some more terms

BAC, EAC and ETC.

Source slide 61
Putting all the terms together

The summary table; three elements of data.

Source slide 62

Lesson 06

Applying earned value

Earned value needs a time-phased baseline, drawn as an S-curve. This lesson builds that baseline, reads project status from where the three curves sit on a given day, sorts the six possible outcomes, and works through the deck’s two examples.

Open learner explanation
Steps in EVM

The six steps, from defining activities to EAC and ETC.

Source slides 64-65
How to construct the baseline

Uniform daily costs, cumulative costs, the S-curve.

Source slide 66
Putting it all together

EVM values linked to the S-curves.

Source slide 67
Another way of looking at it

Slip and overspend on cost and schedule axes.

Source slide 68
Describe the status of this project

Ahead of schedule and under cost; then behind and over.

Source slides 69-70
Possibilities of earned value outcomes

Six combinations of SV and CV.

Source slide 71
Examples

The 1,500 dollar work package and the country park.

Source slides 72-73

Source appendix

Where the deck needs a careful reading

Read with care

Management salaries: overhead or direct?

Slide 12 lists “management salaries” among overhead costs, while slide 19 classifies the project manager’s salary as a direct cost. Slide 17 resolves it: head office and executive management are indirect. Lessons 1 and 2 say so.

Slipping, reversed

The notes on slide 68 say the project is slipping if earned value is above planned value. That contradicts the deck’s own formulas on slides 58-62, where SV above 0 and SPI above 1 mean ahead of schedule, and the status reading on slide 69. Lesson 6 follows the formulas: the project slips when EV is below PV.

Two formulas for earned value

Slide 57 gives EV as planned value times percent complete; slide 62 gives percent complete times the budget at completion. They agree only when the planned value is the work’s full budget, as in the slide 72 example, where the work was due to finish today. Lesson 5 uses the budget of the work.

ETC (t): time to completion, or final duration?

Slide 62 labels planned duration ÷ SPI as the estimated time to completion, but its interpretation describes a prediction of the final project duration. Lesson 5 reports the interpretation.

Control does not only focus on cost

The notes on slide 52 say project control “does only focus on cost but” also covers schedule, quality and resources. The sense is “does not only”, which Lesson 5 uses.

Contingency and escalation, promised later

Slide 13 says to always include contingency and escalation, “more on those later”, but the deck never returns to them. Lesson 1 reports the instruction without inventing a method.

The house exercise has no total

Slide 35 asks what else is needed to price the house; its notes answer with the wage rate and the exchange rate. Several quantities are ambiguous, such as whether areas are per floor, so Lesson 3 computes no total.

Diagram labels on slide 67

The chart linking the earned value terms to the S-curves places its variance labels loosely. Lessons 5 and 6 rely on the formulas from slides 58 and 62 instead.

Overlapping engineering ranges

The AACE table on slide 39 gives project definition ranges that overlap from one class to the next: 1% to 15%, 10% to 40%, 30% to 70% and 50% to 100%. Lesson 4 reports them as printed.

Reported as stated

Slide 31 lists “overall project costs will be capped” as an advantage of top-down estimation, and slide 61 gives EAC = BAC ÷ CPI as the only forecasting formula. Both are reported as the deck states them.

Study-guide calculations

The deck stops at the indices in the slide 72 example. Lesson 6’s estimate at completion of 2,025 dollars and estimate to complete of 675 dollars apply the deck’s own slide 61 formulas and are labelled as calculations. Every deck calculation was rechecked, and all are correct.

Illustrative wording

Typing slips such as “one-time phased” (slide 12), “Bottoms Up” (slide 33), “project manger” (slide 19), “Tax rent” (slide 22) and “we have doing” (slide 69) are corrected without changing meaning.

Checked against the source slides cited in each note.

What not to take away

The lessons actively work against these misreadings of the material:

  • Good cost control can make up for a weak estimate.
  • Financing and local laws only matter after the estimate is done.
  • The project manager’s salary is overhead.
  • A cost is either direct or fixed, never both.
  • Bulk materials and equipment need the same installation labour.
  • An old quote or a factor is as good as a firm, recent quote.
  • Top-down estimates are as accurate as bottom-up ones.
  • Every decision needs a class 1 estimate.
  • Project control is only about cost.
  • Spending less than planned always means the project is under budget.
  • Earned value is the money spent.
  • EV above PV means the project is slipping.
  • A negative cost variance means the project is saving money.
  • The budget at completion is the expected final cost.

Study-guide synthesis; each item is addressed in the lessons.