Project Management · Module 7Week 7 summary

Week 7 summary · Study-guide synthesis · 7 min

What Week 7 is really teaching

A budget is only as good as its estimate, and an estimate is only useful if progress is measured against it. Week 7 runs from the questions asked before estimating, through categories, methods and accuracy classes, to earned value control.

Listen to this lesson

Hear the lesson read aloud, with each sentence highlighted as you go.

Narrated by an AI voice.

Control starts with the estimate

Read as a whole, the Week 7 deck treats cost control as the second half of a job whose first half is estimating well. This page is a study-guide synthesis of the six lessons and adds no new facts. In those terms, managing cost means answering six questions.

  • What must we know first Lesson 1 asks about financing, equipment funding, economic calculations and local content, and sets the cost management plan.
  • What kind of cost is it Lesson 2 sorts costs by source and variability, and materials into equipment and bulk.
  • How do we estimate it Lesson 3 sets best practice and chooses between top down and bottom up.
  • How good is the estimate Lesson 4 grades it with the AACE classes, matched to the decision.
  • How do we measure progress Lesson 5 defines PV, EV and AC, the variances, the indices and the forecasts.
  • What is the status today Lesson 6 builds the S-curve baseline and reads the project against it.

From questions to control

One way to hold the whole week in mind is as a chain, each step feeding the next. The chain loops: a forecast that runs over the budget sends the team back to the estimate, the plan and its change control.

From questions to control · Study-guide synthesis of Lessons 1-6
  1. Settle the money and the rulesFinancing, equipment, economics, local content · Lesson 1
  2. Cost management planCurrency, accuracy, baseline, thresholds, roles · Lesson 1
  3. Categorize the costsDirect or indirect, fixed or variable, equipment or bulk · Lesson 2
  4. EstimateBest practice, top down or bottom up · Lesson 3
  5. Grade the estimateThe AACE class that fits the decision · Lesson 4
  6. MeasurePV, EV, AC; variances, indices, forecasts · Lesson 5
  7. Read and actThe S-curve baseline and the status today · Lesson 6

Quick reference

Use these four groups for revision. Each line links to the lesson section that teaches it.

Before and around the estimate

Three questions
Financing mix, equipment funding, economic calculations.
Local content
Local sourcing and hiring rules change labour and material costs.
Cost management plan
Currency, accuracy, techniques, baseline, thresholds, change control, roles.
Do not forget
Quality, risk, management, space, overhead, contingency, escalation.

Categories and methods

Direct or indirect
Attributable to the work, or shared overhead; the PM’s salary is direct.
Fixed or variable
Unchanged by production, or changing with it.
Takeoff and quotation
Quantities to build; a priced offer with a validity.
Top down or bottom up
Quick and early, or detailed and controllable.

Accuracy

Class 5
0% to 2% defined; concept screening; −50% to +100% at worst.
Class 3
10% to 40% defined; budget authorization; initial control estimate.
Class 1
50% to 100% defined; check estimates for parts of the project.
Fit for purpose
Feasibility needs class 5 or 4, not class 1.

Earned value

PV, EV, AC
Work planned, work done at budget, money spent.
CV and SV
EV − AC and EV − PV; negative is bad.
EAC and ETC
BAC ÷ CPI, and EAC − AC.
Slip and overspend
EV below PV, and AC above EV.

Study-guide synthesis of the supplied Week 7: Costing and Control source deck. It adds no new facts; each quick-reference line links to the lesson that teaches it.

Your study checkpoint

Ready to practise?

Test the week against eight costing scenarios and a knowledge check, then keep the glossary close for revision.