Project Management · Module 07 · Week 7

Module 7 · Costing and Control

Estimating what a project will cost and keeping it there: what to settle before estimating, the cost management plan, cost categories, estimating methods, AACE estimate classes, and earned value.

Cost is one of the three pillars of project success, and many managers treat it as king. Week 7 follows cost through its two big processes: building a realistic, well-supported estimate, and then controlling the project against it with earned value.

  • Cost management plan
  • Cost categories
  • Estimating
  • AACE classes
  • Monitoring
  • Earned value

Module introduction

No control can rescue an unrealistic estimate.

The deck’s central warning is that no amount of control can rescue an unrealistic estimate. So it starts with what must be known before estimating, sorts costs into categories, sets out best practice and two estimating methods, and grades estimates by accuracy. Only then does it turn to control: when to monitor, and how earned value compares planned work, completed work and actual spending.

Cost on a project: settle, plan, estimate, control · Study-guide arrangement of source slides 3-13
  1. Settle the moneyFinancing, equipment funding, economic calculations, local content
  2. PlanThe cost management plan
  3. EstimateRealistic and well supported
  4. ControlMonitor, report, correct

Your learning path

Estimate it realistically, then measure the work against it.

Open source guide
01Costing basicsCost has to be estimated before it can be controlled, and an unrealistic estimate can never be controlled. This lesson covers what to settle before estimating, local content rules, the cost management plan, and what a project estimate must include.20 min02Cost categoriesCosts can be sorted by their source, direct or indirect, and by their variability, fixed or variable, and a single cost belongs to both. Materials divide into equipment and bulk materials. The lesson ends with two terms every estimate needs: the material takeoff and the quotation.18 min03Cost estimationA good estimate rests on the latest documents, real quantities, recent quotes and market rates. This lesson covers the deck’s best practices, the inputs to the estimating process, top-down and bottom-up estimation, and a house-pricing exercise that asks what is still missing.20 min04Estimate accuracyEstimates are graded by how much of the project is defined when they are made. The AACE classes run from class 5, a concept screening estimate made in under an hour, to class 1, a detailed check estimate for parts of the project. The right class depends on the decision the estimate supports.18 min05Project controlsControl tracks time, money, resources, materials and tasks, not cost alone. This lesson covers when to monitor, and the earned value method: planned value, earned value and actual cost, the variances and indices built from them, and the forecasts of the final cost.22 min06Applying earned valueEarned value needs a time-phased baseline, drawn as an S-curve. This lesson builds that baseline, reads project status from where the three curves sit on a given day, sorts the six possible outcomes, and works through the deck’s two examples.22 minApplied case: a garden, costed bottom upA six-activity cost sheet built from a takeoff, worker-days and 12% overhead to £4,312, then checked, reserved and controlled.CaseWhat Week 7 is really teachingThe six lessons as one cost chain, with a quick reference for revision.Summary